Laserfiche WebLink
<br /> <br />Exhibit A – General Contract Provisions Page 13 of 19 S:\Community Development \Engineering \Engineering RFP \Contract 2014 \PSA -Final -011314 (2) with <br />attachments.doc <br />quality of the executed work of the Contractor(s), and to determine if such work is <br />proceeding in accordance with the contract documents. During such visits and on <br />the basis of the on -site observations, the Engineer will keep the City informed of <br />the progress of the work and will endeavor to identify for the Ci ty defects and <br />deficiencies in the work of the Contractor(s). This agreement does not require the <br />Engineer to evaluate contractor’s safety methods. It is agreed that safety matters <br />are Contractor’s responsibility and that the Engineer shall be responsibl e only for <br />the acts or omissions of its own employees. The Engineer may disapprove work <br />as failing to conform to the contract documents. The Engineer shall not have <br />control or charge of and shall not be responsible for construction means, methods, <br />techni ques, sequences or procedures, or for safety precautions and programs in <br />connection with the work. The Engineer shall be obligated, however, to disclose <br />known dangerous circumstances to the City. <br /> <br /> C.6.4 Review samples, schedules, shop drawings, the resul t of tests and inspections, and <br />other data which the Contractor is required to submit, but only for the <br />conformance with the design concept of the project and compliance with the <br />information given in the contract documents, (but such review shall not exten d to <br />means, methods, sequences, techniques, or procedures of construction or to safety <br />precautions and programs incidental thereto). The Engineer shall receive and <br />review (for general content as required by the specification), maintenance and <br />operating in structions, schedules, guarantees, bonds, and certificates of inspection <br />which are to be assembled by the Contractor in accordance with the contract <br />documents. <br />