Laserfiche WebLink
<br /> <br />Exhibit A – General Contract Provisions Page 15 of 19 S:\Community Development \Engineering \Engineering RFP \Contract 2014 \PSA -Final -011314 (2) with <br />attachments.doc <br />under construction. The report should include budget, schedule and progress <br />information. <br /> <br /> C.7.3 Submit a written report to assist the City Council in determining that the project <br />has been satisfactorily completed. The Engineer shall acquire from the developer <br />or the developer’s engineer five (5) sets of plans of the work that have been <br />revised to show “as constructed” conditions, said plans to be submitted to the City <br />within 90 da ys following completion of the project. <br /> <br />C.8 SCOPE OF ADDITIONAL SERVICES AS THE ENGINEER <br /> <br />If authorized in writing by the City, the Engineer shall furnish additional services of the <br />following type: <br /> <br /> C.8.1 Providing services of professional subconsultants as required for a particular <br />project. <br /> <br /> C.8.2 Providing the type of surveying or related engineering services necessary for <br />preparation of permanent and/or temporary easements, boundary surveys, or plat <br />documents. <br /> <br /> C.8.3 Review of developer’s plats and c oncept plans. Provide assistance to the <br />developer in preparing a plat for improvement projects. <br /> <br /> C.8.4 Additional services in connection with the project not otherwise provided for in <br />this Agreement.