Laserfiche WebLink
<br />Ms. Katie Larsen <br />3/4/2026 <br />Page 2 <br />nd <br />Stormwater management for the Otter Crossing South 2 Addition development is <br />proposing to use the existing City stormwater pond south and east of the project area to <br />provide rate control and water quality treatment. There is a conservation easement for a <br />wetland bank that exists over the existing City pond. Analysis includes a proposed City <br />th <br />roundabout on Otter Lake Road south of 70 Street. Runoff will be routed via the existing <br />storm sewer system along the roadway. <br />nd <br />Future phases of development will provide onsite stormwater management. 2 Addition <br />flows ultimately discharge to the west for a small northern portion of the site and the rest <br />discharges south to Clearwater Creek from the City pond. <br />Additional lots and a future roundabout in Otter Lake Road are included in the drainage area <br />to the existing stormwater pond. These areas were included in the original study prepared <br />by TKDA with 1998 Otter Lake Road improvement project. This pond has capacity to <br />provide stormwater management for the development. The pond existing and proposed <br />discharge rates are summarized below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />2-10-Day <br />Condition10-Year100-Year <br />YearSnowmelt <br />Existing - Creek15.0023.2456.26N/A <br />Proposed - Creek10.3513.6640.14N/A <br />Existing - West5.5910.1527.00N/A <br />Proposed - West3.976.5120.40N/A <br /> Existing – <br />8.7218.6941.10N/A <br />Southeast (wetland) <br /> Proposed – <br />8.7218.6941.10N/A <br />Southeast (wetland) <br />Comments: <br />1.Clarify the extents of what will be constructed as part of the 2nd Addition and what <br />will be constructed as part of the individual lot developments. <br />2.Applicant to verify through RCWD existing City pond use in the conservation <br />easement, see below. <br />3.Per the 2024 RCWD rules, stormwater ponds designed in accordance with NURP <br />criteria satisfy stormwater management requirements. The proposed filtration bench <br />is not needed and should be removed to simplify future maintenance of Pond 2P. <br />a.While implied in the details, show the location of the proposed riprap- <br />stabilized spillway for the pond in the plan view. <br />4.Without the proposed filtration bench, the new proposed outlet through OCS-2 shall <br />be removed. Rate control should be achieved for the updated design via alterations <br />to the existing outlet structures. The NWL of 900 must be maintained. <br />5.Applicant to confirm if storage curves of Pond 2P in HydroCAD are based on as-built <br />or surveyed depths. If surveyed, include bathymetry linework in SWMP for <br />verification. <br />6.Original permitted drainage areas and stormwater calculations for Pond 2P shall be <br />included as an appendix to the SWMP. <br />nd <br />Otter Lake South 2 – Engineering Review <br /> <br />