Laserfiche WebLink
• <br />8 <br />Curb and Gutter at Connection to CB <br />$ 1,014 <br />9 <br />Valley Gutter <br />$ 1,044 <br />10 <br />Ribbon Curb <br />$ 7,369 <br />11 <br />Concrete Spillway <br />$ 375 <br />12 <br />Landscaping / Seeding <br />$ 38,000 <br />13 <br />Erosion Control Blanket <br />$ 2,750 <br />14 <br />Plantings in Existing Rain Gardens <br />$ 17,900 <br />15 <br />Site Signage <br />$ 250 <br />16 <br />Electrical <br />$ 47,245 <br />17 <br />Asphalt Trenching and Patch for Electrical <br />$ 2,000 <br />18 <br />SWPPP <br />$ 400 <br />Total Estimated Cost of Developer <br />Improvements <br />$ 386,103 <br />Security Requirement (Total * 35 %) <br />$ 135,136.05 <br />C. Plans & Specifications. The Developer shall prepare plans and <br />specifications for the making of such improvements. Said plans and <br />specifications shall be subject to review and approval by the City of Lino <br />Lakes and Rice Creek Watershed District. <br />D. Construction Observation. The Developer shall instruct its engineer to <br />provide adequate field inspection personnel to assure an acceptable level <br />of quality control to the extent that the Developer's engineer will be able <br />to certify that the construction work meets the applicable City standards as <br />a condition of City acceptance. In addition, the City may have one or <br />more inspectors inspect the work on a full or part-time basis to assure that <br />construction proceeds pursuant to the Plans and other applicable <br />requirements. The Developer, its contractors and subcontractors, shall <br />follow all reasonable instructions received from the City's inspectors, <br />provided said instructions relate to compliance with applicable laws, <br />regulations, and the Plans. <br />E. Record Plans. Within thirty (30) days after the completion of the <br />improvements the Developer shall supply the City with a complete set of <br />reproducible mylar "Record" drawings, and two complete sets of paper <br />copy "Record" drawings, all prepared in accordance with City standards. <br />An electronic copy of the plans shall also be submitted in an AutoCAD <br />DWG format. <br />F. As -Built Survey. The Developer's engineer shall certify, in writing with <br />an as -built survey, that all grading complies with the grading plan. The <br />as -built survey must include, but is not limited to, proposed and final <br />contours with adequate elevation shots to show conformance, property <br />Eagle Brook Performance Agreement 201 1 page 3 of 8 <br />