My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/27/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
06/27/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 12:54:17 PM
Creation date
1/30/2014 8:32:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/27/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Memorandum <br />DATE: August 5, 2009 <br />TO: Jeff Smyser <br />FROM: .lanes E. Studensla, City Engineer 7:55 <br />adt1 <br />RE: Eagle Brook Church — Parking Lot Expansion Review <br />Below is the engineering review of the submitted documents for the Eagle Brook <br />Church — Parking Lot Expansion. The plans for the Eagle Brook Parking Lot <br />Expansion have not been approved please address the following items_ Please <br />contact me with any questions. <br />The review is based on the submittals: <br />1. Rice Creek Watershed District CAPROC dated July 16, 2009_ <br />2. Project Narrative, prepared by SR:F Consulting Group, inc. dated Jurte 12, 2009. <br />3. Geertechnicai Report for Eagle Brook Church dated August 8, 2002. <br />4. Eagle Brook Church Parking Lot Expansion Project Manual, dated June 25, <br />2009. <br />5. Eagle Brook Church — Phase It Parking Lot Expansion Plans, dated June 12, <br />2009. <br />6. Storm Water Pollution Prevention Plan (SWPPP) for the Eagle Brook Church — <br />Parking Lot Expansion, dated May 2009. <br />Drainage and Storm Sewer <br />1. Show the County Ditch 72 Easement. <br />2. Show the concrete wash location. <br />Miscellaneous <br />1. No Importing or exporting of soils without permission of City Engineer <br />2. Show and describe protection measures to be taken to prevent compaction of <br />infiltration basins. <br />3. The 25 inch base bituminous course on pavement detail A should be non- <br />wearing material. <br />4. A new Itu`aintenance of Storrnwater Management Facilities Agreement must be <br />submitted to RCWD. <br />5. Provide constructions cost estimate. <br />5. An agreement will have to be entered into between Eagle Brook Church and the <br />City of Lino Lakes forthe construction. <br />7. All Rice Creek Watershed District comments on the July 16, 2009 CAPROC <br />must be addressee!. <br />600 Town Center Parkway, Lino Lakes, P4'livcn=4.1 55014 -1182 <br />Allan 651 - 9P2 -2400 fax: 651 -982 -2499 <br />
The URL can be used to link to this page
Your browser does not support the video tag.