Laserfiche WebLink
• <br />EXHIBIT A <br />Electrical Permit and Inspection Fees <br />Services, Generators, Feeders to Separate Structures and Other Power Supply Resources <br />o ampere to and including 200 ampere capacity <br />$45.00 <br />Each additional 100 amps or fraction thereof an additional <br />$15.00 <br />Circuits, Feeders, Feeder Taps or Sets of Transformer Secondary Conductors <br />0 amps to and including 30 amp capacity <br />$8.00 <br />31 amps to and including 100 amp capacity <br />$10.00 <br />Each additional 100 amps or fraction of an additional <br />$5.00 <br />One — Family dwelling and each unit of two — family dwelling - Up to including 200 amps services (includes <br />up to 3 inspections) <br />$175.00 <br />Multifamily dwellings each unit (up to 20 circuits and feeder) at <br />$100.00 <br />Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders <br />at the above fens) <br />$3.00 <br />Electrical supply for each manufactured home park lot <br />$45.00 <br />Recreational vehicle site, electrical supply equipment each including factory installed <br />$10.0C <br />Street, parking lot or outdoor area lighting standards, and traffic signal standard each <br />$8.00 <br />Transformers For Lighting, Heat and Power <br />Up to and including 10 kilo -volt amps each <br />$20.0C <br />Over 10 kilo -volt amps each <br />$40.0C <br />Transformers and electronic power supplies for electric signs and outline lighting each <br />$8A0 <br />Swimming pool bonding inspection (each separate inspection) Bonding conductors and connections <br />require inspection before concealed. <br />$45.00 <br />Retrofit Modifications to existing lighting fixtures each <br />$0.5C <br />Transient Projects- Power supply fee as identified above, plus 1 hour <br />$90.00 <br />Each attraction or concession inspection <br />$45.00 <br />Special inspection or inspections not covered by above fee is $90.00 ! hr plus mileage at the rate <br />established by the IRS <br />$90.0C <br />Re- inspection fee when inspection is necessary to determine whether the unsafe conditions have been <br />corrected a fee will be assessed by the inspector <br />$45.00 <br />Minimum Fee Per Trip <br />$45.0 <br />All fees are subject to State of MN surcharge Fees of <br />$5.0 <br />Total Of All Fees <br />`Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay $75 or two times the permit fee (which ever is greater) <br />not to exceed $9000.00. *For purposes of interpretation, Minnesota Rules, Chapter 5600, and the most recently adopted edition of the National Electric <br />Code shall be prima facie evidence of the definitions, interpretations, and scope of words and terms used. <br />