My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/10/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
10/10/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 1:44:20 PM
Creation date
1/31/2014 9:55:14 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/10/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P95 <br />line; thence South 27 degrees 36 minutes West, along said <br />northwesterly right of way line, 374.11 feet to the point of beginning. <br />Except roads. Subject to easements of record. <br />NOW, THEREFORE, in consideration of the mutual promises of the parties made <br />herein, <br />IT IS AGREED BY AND BETWEEN THE PARTIES HERETO: <br />I. DESIGNATION OF IMPROVEMENTS. <br />A. Improvements on the project site to be installed at the Developer's <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as "On -site Work ". <br />B. Improvements off the project site to be installed at the Developer's <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as "Off -site Work ". <br />C. Developer shall enter into an operation and maintenance agreement for <br />stormwater treatment features on the site. <br />II. ON -SITE WORK. <br />A. On -Site Work. The On -site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The Work includes all on -site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, storm drainage systems, water mains, sanitary sewers, <br />hydrants, curbing, lighting, fencing, fire lanes, sidewalks, trails, outside <br />trash disposal enclosures, exterior building architectural design and <br />building elements, site grading, tree preservation work and erosion control <br />measures. For the purposes of this agreement, onsite work does not <br />include the fuel pumps, canopy, or underground fuel tanks. <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.