My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/05/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
12/05/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 2:19:24 PM
Creation date
2/3/2014 8:39:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/05/2011
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING (101 -417) <br />0UDGET DETAIL <br />Object Code <br />CITY OF LINO LAKES <br />4300 -000 Professional Services <br />Traffic Counts 2,500 <br />Engineering Consultant (hourly) 50,000 <br />4410 -000 Contractual Services <br />Engineering Consultant (Retainer) 52,400 <br />Contracted Svcs: Annual Maintenance - Trimble GPS Software Maintenance Agmt 1,500 <br />52,500 <br />53,900 <br />5000 -000 Capital Outlay 8,500 <br />Trimble GPS hardware /software Upgrade 8,500 <br />NOTE: <br />1) Street Reconstruction Feasibility Study for 2010 not included. Cost: $35,000 <br />2) Engineering Expenditures included elsewhere: <br />Building Dept. $5,000 <br />Water Department $25,000 <br />Sewer Department (estimate) $25,000 <br />Streets Dept. (contracted storm sewer) $18,000 <br />Pavement Management (estimate) $70,000 <br />$143,000 <br />Total Engineering including Comm. Deg $249,400 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.