Laserfiche WebLink
• <br />• <br />SSR & W Minor Subdivision <br />page 3 <br />An access management study was prepared for Main St. by Anoka County and <br />participating cities including Lino Lakes. The study, completed in 1999, recommends a <br />full access intersection at West Rondeau Lake Rd. Because W. Rondeau Lake Rd. <br />already exists, this is a logical location. <br />The Metropolitan Council also requires the City to preserve right of way to accommodate <br />future development. The road easement dedication recommended by staff along the east <br />edge of the site best responds to this requirement. <br />The proposal submitted by SSR & W is to dedicate additional right of way for Dupont <br />Ave. along the southern edge of the property. This road would not be constructed. The <br />prospective buyer of the new 11 -acre lot would use the one -acre strip for access to Main <br />St. There are several problems with this proposal. <br />Currently, both Dupont Ave. and Duffee Drive are'% rights of way (33 ft. wide). Dupont <br />runs along the southern edge of the site. Duffee Drive meets Dupont at the southeastern <br />corner of the site. The proposed additional easement would extend along Dupont to Lois <br />Lane. There is no connection to Main St. <br />Currently, an electric power transmission line easement follows the Dupont Ave. <br />alignment: the location for the road easement proposed by the applicant. It would be <br />very difficult to convert this location to a road. <br />In contrast, Oak Lane is a full 66' right of way now except 200 feet just west of the <br />freeway. The option recommended by staff would use this to plan the future Main St. <br />connection. <br />Much of the land in the area is wetland. Construction of the future road connection <br />would involve wetland impacts regardless of the alignment. <br />Adjacent Property Access <br />Access to future development is an important issue. Another important issue is the <br />current access situation for the adjacent land owner. The property at 1196 Main St. <br />currently accesses Main St. via a driveway in the one -acre piece. The current residents <br />there, Steve Martichuski and Kathy Matzke, have explained to staff that it was their <br />understanding that a public road was to be constructed there. The deed to their property <br />refers to a road easement, they say. For this reason, they oriented their garage to the east, <br />with their driveway connecting to the long driveway that runs to Main St. <br />The fact that the one -acre piece is 66 feet wide indicates that, sometime in the past, <br />someone planned the strip for a road. However, we have no information indicating that <br />the City has any rights or ownership in the property now. <br />The staff recommendation accommodates the need for access to this property. As stated <br />in the conditions in the resolution, the City will allow this property to use the road <br />easement for access to Main St.. <br />