My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/11/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
02/11/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 3:15:39 PM
Creation date
2/3/2014 12:06:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/11/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to service the property. The Developer shall hire the Contractor, with the approval of the Cities <br />of Lino Lakes and Hugo, to install the improvements. <br />B. The Developer shall prepare all necessary documents to bid out the <br />project. The Developer shall hire contractors to install the water system to the property. The <br />contractors shall be of the choosing of the Developer. Neither Hugo nor Lino Lakes shall be <br />responsible for any actions of the Developer or the Developer's contractors regarding the <br />installation or construction of the water system. All work to be done in constructing and <br />installing the water system within Lino Lakes shall be done subject to the approval of the Lino <br />Lakes City Engineer in accordance with City standards and requirements. All work to be done in <br />constructing and installing the water system within Hugo shall be done subject to the approval of <br />the Hugo City Engineer. The interconnect and appurtenances shall be contructed in accordance <br />• with the direction of both cities. <br />C. The Developer shall hold harmless and defend Hugo and Lino Lakes from <br />any and all claims made by anyone for any defects or damages of any kind caused by the <br />installation and/or construction of the water system. <br />D. The Developer shall obtain any and all easements necessary to extend Lino <br />Lakes' water system to the property. This shall be done at no cost to Hugo or Lino Lakes. <br />E. Developer shall, contemporaneously with the execution of this Agreement, <br />deposit with Hugo an escrow of Two Thousand Dollars ($2,000.00) to cover the cost of legal <br />fees, administrative expenses, and other costs related to this Joint Powers Agreement and <br />development. <br />• <br />All fees and costs incurred by Hugo in connection with the development <br />shall be charged against said escrow account which shall remain in effect until the completion of <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.