My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/08/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
04/08/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 2:50:21 PM
Creation date
2/4/2014 10:16:33 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/08/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />approved Plans and as required by the plan approval, such as, but not limited to: landscaping, <br />private driveways, parking areas, storm drainage systems, water mains, sanitary sewers, hydrants, <br />curbing, lighting, fencing, fire lanes, sidewalks, trails, outside trash disposal enclosures, site <br />grading, and erosion control measures. <br />COST ESTIMATES <br />The Developer shall provide the City with a written estimate of all applicable costs of the <br />Work, itemized by type; the estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed by the City, and the City <br />shall establish the actual amount of the financial guarantee. <br />Cost of Developer's Improvements, and description are as follows: <br />Description of Improvements Estimated Costs <br />1. Lighting $12,000.00 <br />2. Fences /Screen Structures $6,000.00 <br />3. Trash Disposal Enclosures $14,000.00 <br />4. Curbing/Islands/Delineators $25,000.00 <br />5. Storm Drainage System/ Sewers/ Catch <br />Basins /Culverts /Swales $20,000.00 <br />6. Driveway /Curbcut/Parking Lot/Fire Lane <br />Construction $47,000.00 <br />7. Watermains/Hydrants /Sanitary Sewers $16,000.00 <br />8. Landscaping $30,000.00 <br />9. Site Grading $27,000.00 <br />10. Erosion Control $1,500.00 <br />Total Estimated Cost of Developer <br />Improvements $198,500.00 <br />Security Requirement (Total x .35) $69,475.00 <br />04/03/02 2 TCF Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.