My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/13/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
05/13/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 2:40:39 PM
Creation date
2/4/2014 12:59:34 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/13/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Highland Meadows Park Master Plan City of Lino Lakes <br />Highland Meadows Park Master Plan Project <br />Date: April 4`h, 2002 Preliminary Master Plan Cost Estimate <br />Description of Work <br />Cost <br />1 <br />General Sitework <br />Removals, earthwork, & erosion control: $30,000 <br />Import and spreading of topsoil (approx. 6300cy): $63,000 <br />93,000.00 <br />2 <br />Landscaping <br />Seed /Sod: $16,000 <br />Landscape Improvements (budget amount): $20,000 <br />36,000.00 <br />3 <br />Asphalt Trails <br />8' wide trails: $20,000 <br />6' wide trails: $ 2,000 <br />22,000.00 <br />4 <br />Children's Play Area <br />Equipment (installed): $50,000 <br />Curb: $ 7,500 <br />Resilient Surfacing: $ 4,000 <br />Concrete Walks: $ 3,200 <br />64,700.00 <br />5 <br />Arbor Seating Area <br />(Includes concrete pad & arbor structure - budget amount) <br />35,000.00 <br />6 <br />Park Shelter Structure <br />(Includes shelter structure & concrete pad - budget amount) <br />45,000.00 <br />7 <br />Basketball 1/2 Court <br />(Includes asphalt, goal standard, & color coating) <br />8,000.00 <br />8 <br />Sand Volleyball Court <br />4,500.00 <br />9 <br />Miscellaneous Site Amenities <br />(Includes trash receptacles, benches and picnic tables with concrete pads <br />- budget amount) <br />18,000.00 <br />10 <br />Site Irrigation <br />(Includes meter, enclosure, and water & electrical service - assumes that <br />water & electrical service are readily accessible and water pressure is <br />adequate) <br />22,000.00 <br />Development Subtotal: <br />10% Contingency (fees, surveying, etc.) <br />348,200.00 <br />34,820.00 <br />Development Total: <br />383,020.00 <br />Brauer & Associates, Ltd. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.