My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/22/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
07/22/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 2:07:03 PM
Creation date
2/6/2014 9:20:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/22/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Memorandum <br />DATE: July 3, 2002 <br />TO: Mike Grochala <br />FROM: James E. Studenski, City Engineer ,U <br />RE: Stoneybrook Subdivision <br />A preliminary review of the resubmitted documents has been performed. The <br />submittal included an eight -page revised drawing set dated June 3, 2002, item by item <br />response letter to city comments plus exhibits dated May 29, 2002, supplemental letter <br />dated May 31, 2002, and revised fire flow documentation dated June 10, 2002, for the <br />proposed Stoneybrook Subdivision has been performed. The design generally meets <br />City requirements. The following comments must be addressed prior to final approval <br />given for this subdivision: <br />Watermain: <br />- Watermain lines are to be Class 52 ductile iron pipes in final specifications. <br />- The City of St. Paul requirements for crossing the aqueduct must be submitted. <br />- Confirmation of adequate water system supply is under review. <br />- City will confirm size of watermain extension to the west boundary at Birch Street. <br />- Utilities shall be extended to the project's south boundary in Street G. <br />The submittal meets all remaining design standards required by the City of Lino <br />Lakes. Upon receiving the plans and specifications for the project, the specific details <br />of materials, construction standards, and testing requirements will be reviewed. <br />Sanitary Sewer: <br />The sanitary sewer crossings of the watermain are to show at least 18 inches of <br />vertical separation in final plans. <br />As defined in the Comprehensive Land Use Plan (Sewer Element), this project is <br />in Sewer District 1 and 5. Sewer District 1 will service this subdivision and will <br />provide adequate capacity for the project. <br />The existing sanitary sewer system has adequate capacity to handle the new <br />subdivision. <br />The lift station at Black Duck Drive is scheduled for upgrading which will further <br />increase and improve the ability to service the area. <br />Utilities shall be extended to the project's south boundary in Street G. <br />600 Town Center Parkway, Lino Lakes, Minnesota 55014-1182 <br />Phone: 651 - 982 -2400 • Fax: 651- 982 -2499 • TDD: 651 - 982 -2410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.