My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/22/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
07/22/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 2:07:03 PM
Creation date
2/6/2014 9:20:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/22/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />.J UL-1 .r JUt 10 • J f <br />1 <br />SAINT PAUL <br />REGIONAL <br />WATE R <br />SERVICES <br />Date: July 10, 2002 <br />5HLNI YHUL WHitK UTILITY <br />Engineering Division <br />8 4th St E Suite 400 <br />Saint Paul MN 55101 <br />651 292 7811 P.01/02 <br />Voice; 651- 266 -6270 <br />Fax: 651 -292 -7811 <br />FACSIMILE COVER SHEET <br />PLEASE DELIVER TO: <br />Brian Krystofiak <br />Pioneer Engineering, P.A. <br />Phone: 763- 489 -2271 <br />Fax: 763 -783 -1883 <br />Total Number of Pages: 2 <br />FROM: <br />Bill Tschida <br />phone: 651- 266 -6265 <br />_ilk Zon 2 <br />REMARKS: <br />Saint Paul Regional Water Services (SPRWS) has reviewed the plans for the Stoneybrook development, <br />as received on July 10, 2002, and has the following comments regarding a future roadway and utility <br />crossing of the Board of Water Commissioners easement at Street B extended: <br />1. The raw water conduit located in the easement area will require protection in the form of an 8- <br />inch reinforced concrete mat as show on the attached Exhibit "B ". <br />2. A driveway access on both sides of the roadway must be provided to retain the ability of <br />SPRWS crews to travel north and south with equipment. <br />3. A removable barrier such as a gated fence must be provided along both sides of the roadway <br />within the easement area -to discourage access from the roadway yet allow SPRWS crews to <br />transport equipment over the roadway. <br />4. Utility crossings, as well as plans addressing the above requirements, must be approved in <br />advance of construction. <br />5. A Rider to Agreement between the Board and the City of Lino Lakes granting permission for <br />a crossing and specifying the above and other conditions must be executed prior to <br />construction in the easement area. <br />You can reach me at 651- 266 -6265 to discuss questions of concerns. <br />: Hard copy will follow via U.S. Mall <br />X : Hard copy will not follow via U.S. Mail <br />
The URL can be used to link to this page
Your browser does not support the video tag.