My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
08/12/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 2:01:16 PM
Creation date
2/6/2014 10:16:12 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/12/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Spirit Hills. <br />Page 5 of 9 <br />Lighting: A plan has been submitted for review. The ordinance provides for maximum lighting <br />levels of one -foot candle at the street and 0.4 when casting light onto a residential property. <br />Glare can be an issue from fixtures even if foot -candle measurements are met. Because of <br />proximity to residential uses the type of fixture will be critical. The ordinance requires that light <br />sources be hooded or controlled. The fixture proposed is a decorative, round cutoff luminaries <br />that has the option of a solid dome or a glow dome. Staff believes all of the lights should include <br />a solid dome. The submitted plan does show a combination of domes. No specific lighting type <br />has been provided for under the canopy. Lighting under the canopy shall be designed with <br />completely recessed lighting and no lighting on the canopy sides. <br />Grading and Drainage: The submitted erosion and grading plan is subject to review and <br />approval by the City Engineer. The City Engineer's comments, dated July 3, 2002, are attached. <br />Utilities: The submitted utility plan is subject to review and approval by the City Engineer. <br />The City Engineer's comments, dated July 3, 2002, are attached. <br />Easements: All standard easements are to be dedicated with the final plat. There is an existing <br />drainage and utility easement to be vacated that was previously platted with the Spirit Hills <br />subdivision; this shall be completed prior to issuance of a building permit. <br />Park Dedication: Park dedication has not previously been satisfied on this parcel. As a <br />result, the proposed final plat will be subject to park dedication requirements. For commercial <br />development, a park dedication requirement of $2,175.00 per acre is required. The plat includes <br />3.75 acres, which requires a park dedication of $8,156.25 to be paid prior to recording the final <br />plat. <br />Proposed Use: The development is intended to be used for Retail and Service uses <br />consistent with the GB, General Business District. Three uses proposed on the plan include a <br />Day Care Facility, Motor Fuel Station (Convenience Store) and Bank with Drive -Thru, which <br />require a Conditional Use Permit. Approval of these uses are included as part of the PDO <br />approval but are identified here for clarity in what will be permitted. <br />The Planning and Zoning Board shall recommend a conditional use permit and the Council shall <br />order the issuance of such permit only if it finds that such use at the proposed location: <br />1. Will not be detrimental to or endanger the public health, safety, comfort, convenience or <br />general welfare of the neighborhood or the City. <br />Comment: Bank drive -thru, child day care and service station uses currently exist within <br />the City of Lino Lakes. None of the uses should be detrimental or endanger the public. <br />2. Will be harmonious with the general and applicable specific plans and policies of the <br />comprehensive plan of the City and this ordinance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.