Laserfiche WebLink
Development Contract <br />Clearwater Creek 5th Addition <br />• shall make all necessary adjustments to the curb stops to bring them <br />flush with the topsoil prior to occupancy. <br />• <br />• <br />h) All disturbed areas shall be seeded. <br />i) The front 50 feet of the lots, the street right -of -way, storm water <br />storage ponds, and surface water drainage ways shall be graded prior <br />to commencement of utility construction. <br />j) <br />Drainage swales, ditches, storm water storage ponds and other high <br />risk erosion areas shall be protected from erosion. <br />k) All remaining grading must be completed prior to issuance of <br />building permits. <br />1) Protect streets from erosion deposits. This should include a <br />combination of roadside silt fences, roadside sod strips, catch basin <br />rock bale inlet protection, rock construction entrances, straw mulch, <br />and/or street sweeping. <br />m) The developer's engineer shall certify, in writing, that all grading <br />complies with the grading plan. <br />5. Final street grading, subbase, gravel base, bituminous binder course, and <br />concrete curb and gutter. <br />6. Park trail grading, subbase, gravel base, and bituminous surfacing. If <br />required, installation of boardwalk trails or acceptable substitute or <br />prefabricated walkway panels. <br />7. Storm sewers when determined to be necessary by the City Engineer, <br />including all necessary laterals, catch basins, inlets and other appurtenances. <br />8. Sanitary sewer, laterals or extensions, including all necessary building <br />services and other appurtenances. <br />9. Water, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances. <br />10. The Developer shall place iron monuments at all lot and block corners and at <br />all other angle points on boundary lines. Iron monuments shall be placed <br />after all street and lawn grading has been completed in order to preserve the <br />lot markers for future property owners. Lot corner irons on the back <br />property line shall be installed so that the top of the iron corresponds to the <br />finished ground elevation in accordance with the approved grading plan - <br />guard stakes shall be appropriately installed to mark these irons. <br />page 4 <br />