Laserfiche WebLink
COUNTY OF ANOKA <br />Public Services Division <br />HIGHWAY DEPARTMENT <br />1440 BUNKER LAKE BLVD. N.W., ANDOVER, MINNESOTA 55304-4005 <br />(763) 862-4200 FAX (763) 862-4201 <br />January 24, 2014 <br />Katie Larsen <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014-1182 <br />Re: Preliminary Plat - <br />Northpointe <br />Dear Katie, <br />We have reviewed the preliminary plat of Northpointe, to be located east of CSAH 54 (20t" Avenue <br />South) between Birch Street and Cedar Street within the City of Lino Lakes, and I offer the following <br />comments: <br />An additional 27 feet of right of way adjacent to CSAH 54 will be required for future reconstruction. <br />purposes (60 feet total right of way width east of CSAH 54 centerline). As proposed, all lots within <br />this 313-lot plat will access local roadways, which is consistent with county policy and acceptable to <br />this department. A new local street intersection onto CSAH 54 labelled as "Street A" on the plat will <br />be introduced, located approximately mid -point between the Cedar Street and Birch Street <br />intersections. The Right of access along the remaining portions of CSAH 54 should be dedicated to <br />Anoka County. <br />It appears that there are sight distance deficiencies at the Cedar Street and the proposed "Street A" <br />intersection, with the obstructions being trees. The City and/or the developer should ensure that the <br />applicable sight distance requirements are met to the greatest extent possible for these intersections. <br />Please note no business signs or plantings will be permitted within the county right of way, and care <br />should be exercised when locating buildings, structures, plantings, berms, etc. outside of the county <br />right of way, so as not to create additional sight distance obstructions along this section of CSAH 54. <br />The construction of turn lanes on CSAH 54 in conjunction with this development is warranted. Based <br />on the ACHD Development Review Process Manual, NB and SB CSAH 54 left turn lanes and right <br />turn lanes are to be constructed at Birch Street, a NB CSAH 54 right turn lane and SB CSAH 54 left <br />turn lane are to be constructed and the new "Street A" intersection, and NB CSAH 54 right turn lane <br />and SB CSAH 54 left turn lane are to be constructed at Cedar Drive. It is our understanding the <br />development and roadway connections are to be constructed in stages, so we anticipate that the CSAH <br />54 turn lane construction may also occur in stages. It should be noted that with there being 331 lots <br />within this plat, and CSAH 54 being a high speed single lane roadway, turn movement conflicts <br />should be anticipated at the 3 intersections onto CSAH 54 from this plat should the CSAH 54 turn lane <br />construction lag in relation to the selling of lots and homes within the plat. In addition, as noted in the <br />Northpointe Addition Traffic Impact Study dated November 2013, increases in turn movement <br />conflicts and delays should also be anticipated off -site from the plat at the CSAH 54/CR J intersection, <br />and ACt1D is not aware of any roadway or capacity improvement projects scheduled for this <br />intersection in the foreseeable fixture. <br />Affirmative Action / Equal Opportunity Employer <br />