Laserfiche WebLink
B. Improvements off the project site to be installed at the Developer's <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as "Off -site Work ". <br />IL ON -SITE WORK. <br />A. On -Site- Work. The On -site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The Work includes all on -site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, storm drainage systems, water mains, sanitary sewers, <br />hydrants, curbing, lighting, fencing, fire lanes, sidewalks, trails, outside <br />trash disposal enclosures, exterior building architectural design and <br />building elements, site grading, tree preservation work and erosion control <br />measures. <br />Such improvements shall in completed in accordance with Section IV <br />herein. <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On -site <br />Work is as follows: <br />Description of Improvements Estimated Costs <br />1. Lighting $10,000.00 <br />3. Trash Disposal Enclosures $10,000.00 <br />4. Parking Lot Improvements (curbing & <br />bituminous) $70,000.00 <br />5. Storm Drainage System $10,000.00 <br />6. Sidewalk Construction (including sidewalk on <br />north side of Ware Road) $12,000.00 <br />8. Watermains/Hydrants /Sanitary Sewers $22,000.00 <br />9. Landscaping $20,000.00 <br />10. Site Grading/Erosion Control $18,500.00 <br />Total Estimated Cost of Developer <br />Improvements $172,500.00 <br />Security Requirement (Total * 125 %) $215,625.00 <br />Spirit Hills Performance Agreement 12/04/02 <br />2 <br />