Laserfiche WebLink
COMPENSATING CHANGE ORDER NO. 2 <br />TH STREET UTILITY EXTENSION <br />TH <br />LINO LAKES TOLTZ, KING, DUVALL, ANDERSON <br />0 LAKES, MINNESOTA AND ASSOCIATES, INCORPORATED <br />ENGINEERS - ARCHITECTS - PLANNERS <br />COMMISSION NO. 10414 -99A <br />ITEM CONTRACT QUANTITY UNIT NET <br />NO. DESCRIPTION QUANTITY UNIT TO DATE DIFFERENCE PRICE CHANGE <br />SANITARY SEWER <br />1 <br />MOBILIZATION <br />1.00 <br />LS <br />1.00 0.00 <br />$ 2,500.00 <br />$ - <br />2 <br />CONNECT TO EXISTING SANITARY SEWER <br />1.00 <br />EA <br />1.00 0.00 <br />$ 1,500.00 <br />$ - <br />3 <br />10" PVC, C -900 SANITARY SEWER <br />551.00 <br />LF <br />551.001 0.00 <br />$ 26.00 <br />$ - <br />4 <br />CONSTRUCT 4' DIA. MH <br />4.00 <br />EA <br />4.00 <br />0.00 <br />$ 1,400.00 <br />$ - <br />5 <br />EXTRA DEPTH OF 4' DIA. MH <br />5.30 <br />LF <br />5.30 <br />0.00 <br />$ 100.00 <br />$ - <br />6 <br />4" ON 10" PVC, C -900 WYE BRANCH <br />5.00 <br />EA <br />5.00 <br />0.00 <br />$ 450.00 <br />$ - <br />7 <br />6" ON 10" PVC, C -900 WYE BRANCH <br />1.00 <br />EA <br />3.00 <br />2.00 <br />$ 500.00 <br />$ 1,000.00 <br />8 <br />4" PVC, C -900 SERVICE PIPE <br />115.00 <br />LF <br />113.00 <br />(2.00) <br />$ 15.00 <br />$ (30.00) <br />9 <br />6" PVC, C -900 SERVICE PIPE <br />18.00 <br />LF <br />44.00 <br />26.00 <br />$ 25.00 <br />$ 650.00 <br />10 <br />TELEVISE SANITARY SEWER MAINS <br />551.00 <br />LF <br />551.00 <br />0.00 <br />$ 1.00 <br />$ - <br />SUBTOTAL - SANITARY SEWER <br />$ 1,620.00 <br />WATERMAIN <br />1 <br />CONNECT TO EXISTING WATERMAIN <br />1.00 <br />EA <br />1.00 <br />0.00 <br />$ 550.00 <br />$ - <br />2 }6" DIP, CL. 52 WATERMAIN <br />28.00 <br />LF <br />58.00 <br />30.00 <br />$ 25.00 <br />$ 750.00 <br />3 8" DIP, CL. 52 WATERMAIN <br />545.00 <br />LF <br />545.00 <br />0.00 <br />$ 22.00 <br />$ - <br />iii6" RES. SEAT GATE VALVE & BOX <br />2.00 <br />EA <br />4.00 <br />2.00 <br />$ 500.00 <br />$ 1,000 00 <br />8" RES. SEAT GATE VALVE & BOX <br />1.00 <br />EA <br />1.00 <br />0.00 <br />$ 600.00 <br />$ <br />6 6" HYDRANT <br />1.00 <br />EA <br />1.00 <br />0.00 <br />$ 1,300.00 <br />$ - <br />7 1" TYPE "K" WATER SERVICE <br />100.00 <br />LF <br />99.00 <br />(1.00), $ 7.00 <br />$ (7.00) <br />8 1" CORPORATION STOP <br />5.00 <br />EA <br />5.00 <br />0.00 1 $ 75.00 <br />$ - <br />9 1" CURB STOP & BOX <br />5.00 <br />EA <br />5.00 <br />0.00 <br />$ 75.00 <br />$ - <br />10 MJ FITTINGS <br />335.00 <br />LB <br />335.00 <br />0.00 <br />$ 4.00 <br />$ - <br />SUBTOTAL - WATERMAIN <br />$ 1,743.00 <br />STREETS & RESTORATION <br />1 REMOVE & DISPOSE BIT. SURFACE <br />1380.00 <br />SY <br />1300.00 <br />(80.00) <br />$ 3.00 <br />$ (240.00) <br />$ (99.00) <br />$ (1,680.00) <br />$ (2,000.00) <br />2 SAWCUT BIT. PAVEMENT (FULL DEPTH) <br />143.00 <br />LF <br />110.00 <br />(33.00) <br />$ 3.00 <br />3 1 1/2" -2350 TYPE LV 4 WEARING COURSE <br />150.00 <br />TN <br />110.00 <br />(40.00) <br />$ 42.00 <br />4 2" -2350 TYPE LV 3 NON - WEARING COURSE <br />200.00 <br />TN <br />150.00 <br />(50.00) <br />$ 40.00 <br />5 5" AGGREGATE BASE, CLASS 5 <br />530.00 <br />TN <br />447.27 <br />(82.73) <br />$ 14.00 <br />$ (1,158.22) <br />$ (15.00) <br />6 BIT. MATERIAL FOR TACK COAT <br />70.00 <br />GA <br />65.00 <br />(5.00) <br />$ 3.00 <br />7 TOPSOIL 4" DEPTH <br />220.00 <br />CY <br />144.00 <br />(76.00) <br />$ 10.00 <br />$ (760.00) <br />$ (828.00) <br />8 SODDING <br />1400.00 <br />SY <br />1124.00 <br />(276.00) <br />$ 3.00 <br />SUBTOTAL - STREETS & RESTORATION <br />$ (6,780.22) <br />TOTAL <br />$ (3,417.22) <br />• <br />Page 1 <br />