Laserfiche WebLink
Lino Lakes City Council Minutes <br />7. COMMUNITY DEVELOPMENT REPORT <br />A. Great River Energy Easement Maintenance <br />The Environmental Coordinator reported that the City Council requested a meeting to <br />discuss the ongoing maintenance and tree removal along the Great River Energy (GRE) <br />transmission line corridor. GRE owns easements and operates power lines throughout <br />the City of Lino Lakes. They are currently undertaking maintenance operations that <br />include an area west of Lake Drive. The easement agreement for this location was <br />executed on October 3, 1968. The easement is granted to Rural Cooperative Power <br />Association and its successors; Great River Energy (GRE) and runs in perpetuity. <br />The easement documentation allows GRE the right to cut down, trim, and remove trees <br />within the easement. In this location, the easement is 45' on either side of the <br />transmission line. The language of the easement document grants the utility the right to <br />cut down, trim, or in any manner eliminate all trees, shrubbery or brush within the <br />easement and to cut down from time to time all other dead, weak, leaning, or <br />dangerous trees that are tall enough to strike the wires in falling. The easement width <br />varies along the corridor between a distance of 45' to 50' on either side of the electric <br />transmission line. <br />GRE has completed routine maintenance, trimming, and removals throughout the city <br />over the course of many years along the transmission lines. <br />The City was notified in early March by Carr Tree Service of the work that was proposed <br />as part of normal maintenance operations within the city, which included land owned or <br />managed by the city within the transmission easement. The City met with Carr and GRE <br />in mid -March to go over proposed removals of trees and shrubs within the city owned <br />and managed areas. City staff walked the corridor with GRE and spoke with several <br />residents onsite during the site visit. <br />Lino Lakes was notified by GRE that they would be completing additional removals <br />throughout the corridor to bring the area into compliance with federal regulations. The <br />corridor was to be staked to show easement locations and GRE would inventory and list <br />trees that were proposed for removals. It is our understanding the GRE door knocked <br />and communicated with residents prior to the staking as feasible. <br />The City received a letter dated April 13th from GRE further outlining the work that was <br />proposed within the city -managed parcels. The letter was specific to the area managed <br />by the city and outlined the removal and work to be completed. It is our understanding <br />that each impacted resident received a similar letter from GRE. <br />Page 3 of 8 <br />