Laserfiche WebLink
Lino Lakes City Council Minutes <br />Rick Gobell, 7840 Lois Lane, questioned if the trees and shelter building in the city park, <br />within the easement, were going to be allowed to stand. <br />The Environmental Coordinator stated that when GRE gets to that section of the project, <br />the trees will likely be removed, and GRE would evaluate the structure at that time. He <br />stated that the structure has been in that location since 1979 and GRE would have <br />LiDAR information on the height. He noted that the original project that was completed <br />for the structure is from 1979 and the project files would need to be reviewed for any <br />further details on this matter. <br />Kristi Jokela, 642 Lois Lane, Lino Lakes, stated that she was told by GRE that they want <br />to increase the voltage of the transmission line and if they do they would look to buy <br />her home and others. She stated that messaging has since changed. She would like to <br />know from GRE what the future is regarding the possible need to purchase her home. <br />She also questioned the impact of this on the value of her home if they do not buy it. <br />Ms. Jokela stated that they were told by the tree contractor for GRE that two trees <br />needed to be cut and her husband did that. Then GRE identified more trees and the <br />fence for possible removal as a potential hazard. She stated that she had to share the <br />tags for the dwarf lilacs within the easement with GRE, to keep them. She questioned <br />how it was safe for her family if the transmission lines presented such a potential hazard <br />if a tree causes them to arc. She questioned how her house was allowed to be built if <br />the lines were that dangerous. <br />Ms. Jokela stated that the stumps of the trees that were cut down were treated with an <br />herbicide by the contractor for GRE. She reported that they did not receive advance <br />notice that this was going to be applied and that they were told it would be safe (with <br />caution that the dog should not chew on the bark) once dried in 15 minutes or so after <br />application, however, it was not dry when they were outside that day. <br />The Environmental Coordinator concurred that an herbicide would be safe once it was <br />dry. That while he did not know the timing of the application, however, it could have <br />been the tree weeping not that the herbicide was not yet dry. He noted that typically <br />this type of herbicide is painted on as well to prevent any drift. <br />Patty Miller 476 Lois Lane, Lino Lakes, stated that her home is one lot away from the <br />transmission line easement. She noted that in the past GRE has used an herbicide spray <br />that has drifted to her property. She said that she contacted GRE regarding why they <br />were using herbicide when in the past they only cut the trees/shrubs to remove them <br />from the easement. GRE has told her that the herbicide was safe, however, she still has <br />environmental concerns with it's use. She said that GRE plans to remove all the greenery <br />Page 6 of 8 <br />