Laserfiche WebLink
PARK BOARD <br />STAFF REPORT <br />AGENDA ITEM 7.A. <br /> <br />STAFF ORIGINATOR: Rick DeGardner, Public Services Director <br /> <br />MEETING DATE March 4, 2026 <br /> <br />AGENDA ITEM: New Pheasant Hills Playground Equipment <br /> <br />INTRODUCTION <br />The Pheasant Hills Playground equipment (originally installed in 1996) is scheduled to be <br />replaced this Spring. <br /> <br />BACKGROUND <br />Parks Department staff will take care of the removals of the existing equipment, border, and <br />pea gravel. The configuration of the play area will be slightly enlarged with new concrete <br />edging installed by the Parks Department. A certified playground installer will assist the Parks <br />Department with the installation. <br /> <br />Attached is a colored rendering of the project. <br /> <br />The Shenandoah Park playground, originally installed in 1998, is also scheduled to be replaced <br />Fall, 2026 <br /> <br />RECOMMENDATION / REQUESTED DIRECTION <br />N/A <br /> <br />ATTACHMENTS <br />1. Pheasant Hills Equipment Renderings <br /> <br />Page 9 of 18