My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/28/2000 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2000
>
02/28/2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 4:54:29 PM
Creation date
2/11/2014 9:11:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/28/2000
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Site Plan Review, Anoka Parks <br />February 28, 2000 <br />page 2 <br />siding (horizontal, 1" overlap, 7" exposed) will cover the exterior walls. Three walls will include <br />windows. This building will have vending machines on the exterior of the northwest wall. The <br />building will house the lifeguard office and locker room <br />The restroom building (drawing A6) will be approximately 25' x 25' with an additional roof <br />overhang. The overhang on two sides will be about 7' and 2' on the other two sides. Asphalt <br />shingles will cover the pitched roof which will peak at about 15' in height. The north and south <br />sides will feature barrel vaults on the roof with louvres. Cedar siding will cover the exterior <br />walls. <br />The picnic shelter (drawing A7) measures 50' x 50' square. A concrete floor will be covered by <br />a sheltering pitched roof topped by a clerestory structure. A 24' x 30' area will have an overhead <br />trellis extending from one side of the shelter. On another side, the floor slab will extend out to a <br />6' fire pit surrounded by crushed rock.. The roof will peak at 24' in height and will be covered <br />with asphalt shingles. The support columns will be covered with cedar lap siding. <br />Roads: Access will be via the access road to the Park off Main St. <br />Utilities: An existing 6" water well on the site will continue to serve site, including the new <br />• buildings. The site will connect to Centerville sanitary sewer. We have not seen the utility plans <br />for the sewer connection. A condition of approval should require that the utility plans must be <br />submitted for review by the Lino Lakes City Engineer. <br />Environmental Board Review: The Environmental Board reviewed this project at its <br />January 26 meeting. The Board had no recommendations on the project. <br />Planning & Zoning Board Action and Conditions of Approval <br />The P & Z voted on February 9 to recommend approval of this application with a 6/0 vote. The <br />P & Z recommendation included the following condition: <br />1. Final utility plans shall be submitted for review by and obtain the approval of the Lino Lakes <br />City Engineer. <br />OPTIONS <br />1. Approve site and building plan as submitted with the condition listed in this report. <br />2. Table application and return to staff with direction. <br />S RECOMMENDATION <br />Option 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.