Laserfiche WebLink
FOREST LAKE CONTRACTING BARBAROSSA & SONS REDSTONE CONST. CO. <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />$ 292.80 <br />$ 250.00 <br />r <br />0i <br />r <br />I- <br />49 <br />1 $ 571.44 <br />r <br />o)o <br />((0 <br />r <br />49 <br />0 <br />co <br />69 <br />$ 559.71 1 <br />8 <br />oi <br />49 <br />r <br />v <br />COO <br />v <br />49 <br />r $ 6,475.00 1 <br />0 <br />0 <br />o <br />co <br />69 <br />1 $ 2,425.00 1 <br />$ 8,312.50 <br />$ 11,155.00 <br />8 <br />10 <br />OD <br />o <br />49 <br />$ 12,093.75 <br />8 <br />0)10 <br />CO C <br />r <br />49 <br />0 <br />to <br />49 <br />L$ 1,522.501 <br />0 <br />o0 <br />N� <br />(O <br />49 <br />8 <br />49 <br />L$__ 428.401 <br />r <br />n <br />1 <br />°n <br />49 <br />0 <br />of <br />I- <br />r <br />a <br />49 <br />$ 412,188.72 <br />1$ 4.88 <br />0 <br />q' <br />(o <br />rN <br />49 <br />01 <br />0) <br />49 <br />I $ 571.44 <br />=q—q <br />0 <br />100(0 <br />49 <br />O <br />49 <br />N <br />CO <br />49 <br />N <br />49 <br />n <br />r <br />49 <br />$ 2.00 <br />$ 250.00 <br />N4 <br />(0 <br />49 <br />(0 <br />49 <br />°m <br />I- <br />49 <br />1-$ 32.25 <br />88 <br />CO <br />69 <br />r <br />44 <br />1$ 7.25 <br />$8 <br />r <br />49 <br />a <br />49 <br />I $ 21.42 <br />$ 300.00 1 <br />$ 500.00 <br />1 $ 1,020.00 1 <br />O <br />O <br />O <br />10 <br />49 <br />$ 1,700.00 <br />$ 250.00 1 <br />0 <br />0 <br />COO <br />0) <br />49 <br />0 <br />0 <br />W <br />49 <br />$ 4,648.001 <br />$ 4,255.00 <br />0 <br />O <br />8 <br />9 9 <br />$ 1,649.001 <br />$ 8,645.00 <br />0 <br />0 <br />u)B <br />r <br />V.. <br />49 <br />0 <br />0 <br />N <br />r <br />49 <br />0 <br />0 <br />O <br />(O <br />r <br />r <br />49 <br />0 <br />ul <br />N <br />r <br />N <br />r <br />49 <br />$ 217.00 <br />$ 1680.001 <br />0 <br />O <br />88 <br />0 <br />(0 <br />49 <br />0 <br />O <br />49 <br />300.00 J <br />0 <br />N <br />1I0 <br />01 <br />O <br />h <br />49 <br />$ 141,008.50 <br />408,971.5 <br />0 <br />10 <br />49 <br />$ 250.00 <br />0 8 <br />0 <br />N <br />49 <br />$ 500.00 <br />$ 1,700.00 <br />I$ 250.00 <br />0 <br />,r <br />49 <br />oo.e $1 <br />+2 <br />rCV0(0 <br />49 <br />888 <br />49 <br />N. <br />49 <br />49 <br />I $ 5.75 <br />88 <br />o).- <br />64 <br />0) <br />49 <br />1$ 38.50 <br />-88 <br />rCGCV <br />49 <br />49 <br />0. <br />Is 4.001 <br />8 <br />I() <br />49 <br />1 <br />8 <br />0 <br />a <br />69 <br />$ 600.00 <br />$ 1,530.001 <br />0 <br />0 <br />COO <br />49 <br />00'009' G $ <br />$ 325.00 <br />888 <br />0Nh <br />a0r0 <br />49 <br />49 <br />CD <br />49 <br />$ 2,775.00 <br />888 <br />0 <br />000) <br />49 <br />4 <br />r- <br />49 <br />0 <br />h <br />49 <br />$ 12,125.00 <br />8 <br />0(9()10 <br />N.0(�O+2 <br />CD <br />49 <br />14 <br />N <br />r <br />49 <br />8 <br />r <br />r <br />49 <br />8 <br />49 <br />$ 1,680.00 _1 <br />88 <br />00 <br />0)(O+) <br />0 <br />r <br />E9 <br />49 <br />$ 800.00 1 <br />$ 69,887.75 <br />$ 132,608.751 <br />0 ul <br />0) <br />8 <br />CO <br />CO <br />1) <br />49 <br />888 <br />49 <br />0(0) <br />CO <br />49 <br />49 <br />$ 800.00 <br />8 <br />0 <br />(O <br />49 <br />$ 325.00 <br />88 <br />00)N <br />49 <br />49 <br />n80o$N8 <br />ON <br />49 <br />. <br />49 <br />. <br />01 <br />r <br />49 <br />. <br />49 <br />49 <br />49 <br />$ 32.25 1 <br />888888 <br />0) <br />49 <br />49 <br />49 <br />(+)Mv. <br />69 <br />49 <br />. <br />49 <br />J <br />W <br />J <br />W <br />W <br />W <br />C.) <br />CO <br />(A- <br />JO= <br />UJF- <br />F- <br />F- <br />C'3U(AJU <br />0 <br />0 <br />0 <br />N <br />0 <br />co <br />0 <br />r <br />0 <br />n <br />0 <br />.- <br />0 <br />0 <br />0 <br />O <br />3700.01 <br />o <br />(O+) <br />r <br />0 <br />1330.01 <br />O <br />0 <br />0 <br />1250.01 <br />0 <br />n-- <br />(M <br />0 <br />CM <br />0 <br />10 <br />r <br />210.01 <br />O <br />N <br />g <br />O <br />0 <br />r <br />20.0 <br />STORM SEWER <br />REMOVE 24' CMP STORM PIPE <br />REMOVE SIDE INLET CATCH BASIN <br />115' RCP, CL.5 STORM SEWER PIPE <br />115' RC FLARED END W/TRASH GUARD <br />CURB OPENING CATCH BASIN <br />CONCRETE SPILLWAY <br />(CLASS 3 HAND PLACED RIP RAP <br />GEOTEXTILE FABRIC <br />SUBTOTAL - STORM SEWER 1 <br />STREETS & RESTORATION <br />REMOVE BITUMINOUS PAVEMENT <br />SAWCUT BIT. PAVEMENT (FULL DEPTH) <br />SUBGRADE PREPARATION <br />COMMON EXCAVATION (CV) (P) <br />D412 CONC. CURB & GUTTER <br />AGGREGATE BASE CLASS 5 <br />2350 TYPE LV 2 OR 3 NON WEAR. COURSE <br />2350 TYPE LV 4 WEARING COURSE <br />CRS -1 BITUMINOUS MATERIAL FOR TACK <br />(TOPSOIL BORROW <br />SODDING <br />SILT FENCE <br />(WASHED ROCK FOR ROCK ENTRANCE <br />SUBTOTAL - STREETS AND RESTORATION <br />TOTAL ALTERNATE BID <br />GRAND TOTAL BID <br />r <br />N <br />CO <br />'7 <br />to <br />0 <br />h <br />OD <br />r <br />N <br />M <br />'7 <br />to <br />0 <br />o. <br />CD <br />0 <br />0 <br />r <br />f <br />BID TABULATION <br />