Laserfiche WebLink
2 <br /> <br />1. All comments from the City Engineer letter dated December 26, 2013 shall be addressed. <br />2. All comments from the Environmental Coordinated Letter dated January 3, 2014 shall be <br />addressed. <br />3. The City will cooperate w ith the developer to obtain public right -of -way and/or <br />easements for the extension of Fox Road and utilities to the Foxborough development. If <br />acquired , the developer will be responsible for all applicable costs associated with said <br />improvements including land acquisition. <br />4. A Phasing Plan for development shall be included in the plan set. <br />5. Easeme nt documentation for road connection s to Old Birch Street and Pheasant Run <br />South shall be provided to the City. <br />6. Conservation easement shall be drafted by the develo per and submitted to the City for <br />review and approval. <br />7. Conservation easement language shall include allowance for construction of trails, parks, <br />storm water management facilities, retaining walls, etc. <br />8. Comments/Revision to Sheet C0, Title Sheet: <br />a. Old Birch Street shall be renamed Pheasant Run South as required by emergency <br />services. <br />b. Pine Cone Court shall be renamed to eliminate multiple uses of “Pine” throughout <br />the City. <br />9. Comments/Revision to Sheet C1 -1 & C1 -2, Preliminary Grading, Drainage & Erosion <br />Plan <br />a. Pl an sheet notes sidewalk and bituminous trail by others. Sidewalk and trail shall <br />be installed by developer. <br />b. Sidewalk south of Black Berry Court shall be reviewed by the City Engineer to <br />determine if 8 foot wide bituminous trail is feasible. <br />c. A pedestrian ac cess ramp shall be installed south of Lot 15, Block 1 to provide <br />access to the sidewalk/ trail from Black Berry Court. <br />d. A cost estimate for the trail construction shall be provided. <br />10. Comments/Revision to Sheet 1 of 9, Certificate of Survey with Resource Inve ntory: <br />a. The applicant shall submit a Letter of Map Revision (LOMR) to FEMA for <br />review and approval. <br />b. The flood elev ation shall be determined during the platting process. <br />c. Letter of Map Revision shall be submitted after site grading. <br />d. Lots may require flood ins urance until LOMR approved or City may not issue <br />building permits on lots impacted by floodplain until after LOMR approved. <br />11. Comments/Revisions to Sheet 4 and 5 of 9, Preliminary Plat: <br />a. Lots 14 and 15, Block 6 shall not extend into the wetland. <br />b. Lot 15, Block 6 shall have PUD flexibility to allow the rear setback to extend to <br />the conservation easement boundary . <br />c. Lot 1, Block 3 shall be revised so the retaining wall is located entirely within the <br />lot and outside of the standard drainage and utility easement. <br />d. Lot 1, Block 2 shall not extend into the wetland. <br />e. Lot 1, Block 2 shall have PUD flexibility to allow the rear setback to extend to the <br />conservation easement boundary . <br />12. Comments/Revisions to Sheet 7 and 8, Preliminary Landscape and Planting Plan: <br />a. The landscape plan shall include Open Area Landscape calculations as required <br />per ordinance.