Laserfiche WebLink
• 4. When feasible without damaging trees and quality wetland plant communities, spoil <br />pilesfromprevious excavations on the property should be removed and spread on <br />upland areas. <br />5. Detailed grading and seeding plans will be prepared prior to project implementation. <br />6. Apprapriateinfiltration methods will be utilized, where, feasible, in the placement, <br />design, and construction of the trail to minimize backyard runoff from directly <br />entering adjacent wetlands. <br />7.. In. Year 2003, trees that have been killed or are determined to be dying due to <br />increased water levels within Wetland Q. will be removed. <br />"Hazard.Trees "adjacent to the trail will be removed at the time the trail is <br />constructed. <br />• <br />