My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/14/2002 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
2002
>
08/14/2002 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 10:38:25 AM
Creation date
2/13/2014 10:38:00 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
08/14/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning & Zoning Board <br />August 14, 2002 <br />Page 13 <br />APPROVED MINUTES <br />building plan review process. At this point, the site plans provided for Lots 1-3 are <br />conceptual in nature and are intended to dem onstrate the developabili ty of the lots and a <br />comprehensive storm water management and circulation system. <br />Access to the proposed retail center is to be provided via two 30-foot wide curb cuts <br />along Apollo Drive. <br />While the westerly curb cut is in direct alignment with an existing curb cut to the north, <br />the easternmost curb cut is slightly offset fr om an existing curb cut to the north. As a <br />condition of site and building plan approval, the easterly cu rb cut should be shifted <br />approximately 15 feet to the west to create a direct alignment. Additionally, approval of <br />the easterly curb cut will require an access agreement with Kohl’s. <br />Staff stated the proposed circul ation is considered well con ceived and is integrated into <br />the overall circulation system proposed for the subdivision. <br />One minor concern that exists in regard to site circulation is the temporary dead-end <br />parking arrangement on the west side of the site. To address this concern, a temporary <br />turn-around should be provided at the western terminus of the parki ng area (either on site <br />or within Lot 3). <br />Staff indicated while the Planned Development Over lay designation can provide <br />flexibility from the strict terms of the Or dinance, the requirements of the underlying SC, <br />Shopping Center District are considered an appropriate guideline. <br />Staff noted within SC zoning di stricts, a 50-foot setback is required from arterial streets. <br />As shown on the preliminary site plan, a 30-foot principal build ing setback has been <br />proposed along I-35. At 2.3 acres in size, th e subject property also fails to meet the <br />minimum 3-acre lot requirement imposed in the SC District. <br />Staff stated the PDO section of the Ordinance does state how ever, that perimeter setbacks <br />can be established by applying the setback requirements of th e surrounding district or can <br />be related to the height of the buildings. While both the proposed setback and lot area <br />deviations can be accommodated via the PDO, City officials should determine their <br />acceptability. <br />As a condition of site and building plan a pproval, a determination should be made that <br />the proposed building is cons istent with the design gui delines of the Lino Lakes <br />Marketplace PDO. As shown on the submitte d building elevations, the proposed building <br />replicates many of the design features of the adjacent Target and Kohl’s buildings <br />including: <br />• Colonial Style gable roof forms <br />• Cornice details <br />• A defined base <br />• Accentuated building corners <br />• Finish colors
The URL can be used to link to this page
Your browser does not support the video tag.