Laserfiche WebLink
Planning & Zoning Board <br />November 18, 2009 <br />Page 4 <br />APPROVED MINUTES <br /> <br /> <br /> <br />A vehicle trace study was conducted and results sho wed that the majority of traffic on <br />CSAH 34 has a local purpose. <br /> <br />Traffic modeling resolved that improvements to Coun ty Road J would have little impact <br />on CSAH 34 traffic volumes. Additional capacity on County Road J will not redue the <br />need for CSAH 34 improvements. <br /> <br />Proposed corridor improvements will be staged over the next 20+ years. Improvement <br />sequencing will be triggered by safety and capacity needs, amount of corridor <br />development, available funding, and benefits from i nterim improvements. Possible <br />staging scenarios were discussed. <br /> <br />County access spacing guidelines were discussed. S afety benefits such as raised medians <br />and two-way left-turn lanes were considered. <br /> <br />Mr. Shorten described access modification strategie s. A set of guidelines was developed <br />to determine when access modification will be under taken. Access modification <br />guidelines include: <br /> <br />1. Raised medians constructed with all new traffic sig nals <br />2. Painted medians and turn lanes will be used until o therwise necessary <br />3. Raised medians implemented more extensively with ne w road construction <br />4. Painted medians used until issues require the exten sion of the raised medians <br /> <br />Current access will be maintained until traffic, sa fety and congestion needs arise or as <br />improvements are constructed. <br /> <br />Jack Corkle stated that feedback has shown that res idents do not want to see a four-lane <br />roadway overnight. Residents want a gradual increa se of change only as it becomes <br />necessary. This corridor offers more flexibility than many other in the twin cities area, <br />with different funding sources. Without available money, improvements will need to be <br />made in stages. In areas where there is not an ant iciped area of change in development, <br />improvements can be staged to the future. <br /> <br />Ms. Corkle explained that cities and counties have no authority to change speed limits. <br />Birch Street is currently set at 50 mph and was pre viously 55 mph. An 85 th percentile of <br />current traffic speed is what is used to set or cha nge a speed limit. It is anticpated that the <br />speed will drop on the western end with an increase of traffic. <br /> <br />Ms. Corkle discussed the funding process, explainin g that it is hard to get money right <br />now. The county applies for grants to fund many of its projects. A Highway Safety <br />Improvement Program offers up to two million dollar s, but is competitive throughout the <br />metro area. As part of the process, they must go t hrough a benefit cost analysis, which is <br />based on crash history, the number and severity of crashes. There needs to be a number