Laserfiche WebLink
City of Lino Lakes <br />Park Board Meeting <br />October 5, 1998 <br />• WEST SHADOW LAKE EXTENSION - RICK CARLSON: <br />Rick referred to a memo regarding park dedication for the West <br />Shadow Lake Road Extension. It appears that park dedication for <br />this project was fulfilled with the Millers South Glenn Project, <br />with the expansion of Birchwood Acres Park. Based on the master <br />plan it appears the city needs a trail connection to Birchwood <br />Acres Park along the north side of the plat, west of West Shadow <br />Lake Drive. <br />• <br />Mr. Tedd Mattke, Mattke Engineering, Inc., came forward and <br />reviewed the memo which indicated their most recent sketch plan <br />for West Shadow Ponds, dated September 17, 1998, incorporates <br />comments received from the Planning Commission, including <br />elimination of the temporary cul -de -sac and constructing West <br />Shadow Lake Road all the way to 62nd Street, and shifting West <br />Shadow Lake Road further east at 62nd Street. The project park <br />dedication requirements were met by the land dedication provided <br />for this project. He stated that as the trail dedication, it is <br />anticipated that the Park Board will require construction of the <br />trail into Birchwood Acres Park along the north side of the plat <br />as part of this project. <br />Paul verified that the existing property owner is Mr. Rehbein. <br />He asked if any other property is needed for dedication. Mr. <br />Mattke indicated the two parcels square up all park dedication. <br />Chair Lindy asked where the trail connection from West Shadow <br />f Lake Road into the park will be. Mr. Mattke indicated a 30' wide <br />trail has already been dedicated along the south border of the <br />existing homes. Chair Lindy noted there is already a fence there <br />and it is high land. <br />Pat asked if there will be a north /south trail. Mr. Mattke <br />explained that there will be a north /south trail that connects up <br />with Birch Park. There is also a proposal to connect land into <br />the Miller South Glen development. <br />Mr. Mattke asked for the Park Board approval of the plan before <br />they go before the Planning & Zoning Board. <br />Chair Lindy stated the plan provides what was asked for. He <br />stated the Park Board is in agreement on the park dedication for <br />the West Shadow Lake Extension. <br />0 REQUEST FOR FENCING ALONG NEW TRAIL SEGMENT ON ARROWHEAD DRIVE: <br />Rick stated the trail segment located on Arrowhead Drive directly <br />south of Shenandoah Park should be completed within the next few <br />2 <br />