My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/22/2001 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2001
>
01/22/2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 4:32:42 PM
Creation date
2/18/2014 12:46:43 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/22/2001
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM NO. 4B <br />• STAFF ORIGINATOR: Dan Tesch, Director of Administration <br />DATE: January 22, 2001 <br />TOPIC: Consideration of Hiring General Maintenance Worker — <br />Water/Sewer Department <br />Vote Required: Simple Majority <br />BACKGROUND: <br />The 2001 Water and Sewer Operating Fund Budgets include the provision to create an additional <br />General Maintenance position. The Utilities Department consists of a Utilities Supervisor and a <br />maintenance worker. The existing maintenance worker position was authorized in January, <br />1995. Since that time the city has experienced tremendous growth, which has increased the <br />duties and responsibilities of this department. <br />The additional maintenance position included in the 2001 budget, will not only provide <br />assistance with the typical day to day operations, but will accelerate the implementation of the <br />Phone Read system and water meter changeout program that was approved by the City Council <br />in 1999. <br />Staff is recommending that Mr. Timothy Budig be considered for the General Maintenance - <br />Utilities position. Mr. Budig has worked for the City of Lino Lakes the past three years in the <br />Utilities Department. Mr. Hillesheim and Mr. Payne have spent considerable time educating and <br />showing Mr. Budig the various aspects of our operations. Also, Mr. Budig has demonstrated his <br />hard work ethic and his ability to interact with the general public. <br />Mr. Budig has successfully passed the required tests for his Water Operator License, Collection <br />Systems License, and Low Voltage License. <br />Mr. Budig is available to begin tomorrow, January 23, 2001. Mr. Budig's beginning salary is <br />$15.93 per hour plus benefits. This position will be funded by the Water and Sewer Enterprise <br />Funds. This position will be eligible for membership in the 49'ers Union. A physical <br />examination and drug test will be required prior to Mr. Budig becoming a full time employee. <br />OPTIONS: <br />1. Approve the hiring of Mr. Timothy Budig as General Maintenance - Utilities worker, <br />contingent upon successful drug test and physical examination. <br />2. Return to staff for further review. <br />RECOMMENDATION: <br />Option 1. <br />1/17/01 <br />RD /Correspondence /City Council/ Budig Hiring <br />
The URL can be used to link to this page
Your browser does not support the video tag.