My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/22/2001 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2001
>
01/22/2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 4:32:42 PM
Creation date
2/18/2014 12:46:43 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/22/2001
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7C <br />• STAFF ORIGINATOR: John Powell, City Engineer <br />COUNCIL MEETING DATE: January 22, 2001 <br />TOPIC: PUBLIC HEARING, Bluebill Ponds Utility and Street Improvements <br />• <br />• <br />VOTE REQUIRED: 3/5 Vote required to close the hearing <br />BACKGROUND: <br />This public hearing was continued from the November 13, 2000, City Council <br />meeting. The Feasibility Report for this project assumed Bluebill Ponds would <br />be responsible for all street construction costs, including those for the roadway <br />abutting the Mar Don Acres lots. The developer, Heritage Development, has <br />objected to this approach. <br />The City Attorney has indicated that the City would not be able to assess street <br />construction costs upon subdivision of the Mar Don Acres lots unless we had <br />prior approval from the effected property owners. This prior approval is not <br />required for the City to assess utility costs. <br />Based on the neighborhood meeting which was held Thursday, January 11, <br />2001 and other conversations with Mar Don Acres residents, the City is not able <br />to secure prior approval from these residents for street assessments. Therefore, <br />the proposed assessments to Bluebill Ponds as indicated in the original <br />Feasibility Study, remain unchanged. <br />OPTIONS: <br />1. Close the public hearing. <br />2. Continue the public hearing to February 12, 2001. <br />RECOMMENDATION: <br />Option No. 1 - Staff recommends closing the public hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.