My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/13/2026 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2026
>
05/13/2026 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2026 10:15:52 AM
Creation date
6/30/2026 10:15:49 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/13/2026
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />5/6/2026 <br />Page 2 <br />Pioneer (4/13/2026) A revised grading plan has been prepared to address comments <br />WSB (5/6/2026) Complete <br />Stormwater Management <br />nd <br />Stormwater management for the Otter Crossing South 2 Addition development is <br />proposing to use the existing City stormwater pond south and east of the project area to <br />provide rate control and water quality treatment. There is a conservation easement for a <br />wetland bank that exists over the existing City pond. Analysis includes a proposed City <br />th <br />roundabout on Otter Lake Road south of 70 Street. Runoff will be routed via the existing <br />storm sewer system along the roadway. <br />nd <br />Future phases of development will provide onsite stormwater management. 2 Addition <br />flows ultimately discharge to the west for a small northern portion of the site and the rest <br />discharges south to Clearwater Creek from the City pond. Future outlots will develop with <br />onsite stormwater treatment, of which one proposed BMP will route its draintile to the City <br />pond. <br />Additional lots and a future roundabout in Otter Lake Road are included in the drainage area <br />to the existing stormwater pond. These areas were included in the original study prepared <br />by TKDA with 1998 Otter Lake Road improvement project. This pond has capacity to <br />provide stormwater management for the development. The pond existing and proposed <br />discharge rates are summarized below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />2-10-Day <br />Condition10-Year100-Year <br />YearSnowmelt <br />Existing - Creek14.9023.0755.27N/A <br />Proposed - Creek12.6021.7354.47N/A <br />Existing - West5.5910.1527.00N/A <br />Proposed - West3.976.5120.39N/A <br />Existing – <br />8.7218.7041.11N/A <br />Southeast (wetland) <br />Proposed – <br />8.7218.7041.11N/A <br />Southeast (wetland) <br />Comments: <br />1.Clarify the extents of what will be constructed as part of the 2nd Addition and what <br />will be constructed as part of the individual lot developments. <br />Pioneer (4/13/2026)Taco Bell will construct their own improvements. Tyme will <br />construct improvements to Lot 1 and the stormwater connections in 70th Street <br />along with stormwater basin improvements. <br />2.Applicant to verify through RCWD existing City pond use in the conservation <br />easement, see below. <br />nd <br />Otter Lake South 2 – Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.