My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/13/2026 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2026
>
05/13/2026 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2026 10:15:52 AM
Creation date
6/30/2026 10:15:49 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/13/2026
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />5/6/2026 <br />Page 4 <br />3.WSB (5/6/2026) Replace existing 8"x6" tee with an 8"x8" tee and extend 8" service to <br />Taco Bell lot <br />a.Replace existing 6" gate valve with 8" Gate Valve <br />Sanitary Sewer <br />Sanitary sewer for the platted commercial lots is proposed to be served by connecting to <br />th <br />the existing 6” sanitary sewer service stubs on the north side of 70 Street. Service for <br />Lot 1 will require extending across Lot 2. <br />Comments: <br />1.Easement will be required in favor of the Taco Bell site for utilities from the north side <br />th <br />of 70 Street. <br />Pioneer (4/13/2026)Easement is shown on plans. Tyme will prepare an agreement. <br />WSB (5/6/2026) Complete <br />2.WSB (5/6/2026) Verify that the existing utility service stubs are not present <br />a.Televise and pot hole as necessary <br />3.WSB (5/6/2026) Add cleanouts to sanitary sewer bends <br />Transportation <br />ndth <br />The current Otter Crossing South 2 Addition proposes utilizing the existing 70 Street <br />and north/south service roads while constructing additional accesses. The anticipated <br />uses of the sites were accounted for in the traffic study and analysis conducted with the <br />original overall development. 70th St at Otter Lake Road will become a right in / out in the <br />future. <br />Comments: <br />1.Only one connection will be allowed to 70th Street on the north side and it will <br />ultimately need to line up to a similar single connection on the south side. <br />Pioneer (4/13/2026)Revised to one access. <br />WSB (5/6/2026)(see redline comments on plan sheet)Connections to 70th Street <br />from the north and south should line up <br />-Consider using middle entrance location to allow for queuing at the intersections <br />-Applicant to confirm that queuing works with future right in right out condition from <br />Otter Lake Rd <br />2.Clarify the extents of what will be constructed as part of the 2nd Addition and what <br />will be constructed as part of the individual lot developments. <br />Pioneer (4/13/2026)Taco Bell will construct their own improvements. Tyme will <br />construct improvements to Lot 1 and the stormwater connects along with stormwater <br />basin improvements. <br />WSB (5/6/2026) Complete - Coordinate construction with site owners <br />3.Provide turning movements for emergency vehicles within the proposed sites <br />a.Emergency access to be reviewed by City Fire Official <br />Pioneer (4/13/2026)A fire truck movement exhibit is included in plans. <br />nd <br />Otter Lake South 2 – Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.