Laserfiche WebLink
<br />8.The original site plan Sheet C1.22, Site Plan South dated 3/9/26 showed storage areas in <br />the east side of retail units. <br />a.Storage areas and materials shall not be visible from the outside. <br />9.Lyngblomsten Lino Lakes Campus Plan Set revision date 3/9/2026: <br />a.All applicable plan sheets: <br />i.Existing and proposed sidewalks and trails shall be clearly identified and <br />labeled as noted in the Legends. <br />1.For example, Sheet C1.20, Site Plan Overall clearly shows them <br />marked but Sheet C1.22, Site Plan South does not. <br />b.Preliminary Plat, Sheet 1 of 1: <br />i.Revise to show Lot 2, Block 2 and Outlot C as the new lot. <br />1.Site Data and Density table shall be revised accordingly. <br />c.Sheet C1.22, Site Plan South: <br />i.Show the proposed daycare rooms, outdoor play areas, 5 retail suites etc. <br />as it was approved by City Council on May 11, 2026. <br />ii.This applies to all applicable plan sheets. <br />d.Sheet L1.02, Landscape Plan South: <br />i.The transformer along CR J shall be screened. <br />10.Lyngblomsten Lino Lakes Campus-City Submittal-Final PUD (Amendment 4) dated <br />6/08/2026: <br />a.All applicable plan sheets: <br />i.Existing and proposed sidewalks and trails shall be clearly identified and <br />labeled as noted in the Legends. <br />b.A more detailed layout plan is required for private patio/gazebo area. <br />i.See Sheet L1.4, Town Center Courtyard Layout Plan as an example. <br />ii.Details are needed for gazebo, benches, sitting areas, fences, etc. <br />c.Sheet S1.2, Final Plat: <br />i.There appears to be a parcel line bisecting the lot east to west. Please <br />revise. <br />ii. “Existing Drainage & Utility Easement per Plat of Lyngblomsten at <br /> Lino Lakes Addition” was vacated on May 26, 2026. <br />1.New easements shall be dedicated on this plat. <br />d.Sheet L1.01, Landscape Plan South: <br />i.The transformer along CR J shall be screened. <br />ATTACHMENTS <br />1.Lyngblomsten Site Plan <br />2.Preliminary Plat <br />3.Architectural Rendering <br />4.Landscape Plan South <br />5.Master Plan-Hodgson Road & CR J Study <br />6.Concept Plan-Gateway Planning Study <br />7.Final Plat <br />6 <br /> <br />