Laserfiche WebLink
11. <br />12.The project will disturb more than an acre of soil and will be required to <br />obtain an NPDES permit. Proof of permit shall be required before <br />construction. <br />a.A SWPPP shall be required in additional submittals as required by the <br />MPCA meeting sections 5.2-5.26. <br />b.Final erosion and sediment control will be reviewed with future <br />submittals. <br />c.Inlet protection required on all existing catch basins. <br />Page 2 <br />