Laserfiche WebLink
FINAL GRADING AND DRAINAGE PLAN <br />LEGEND <br />SILT FENCE <br />BA[[ CHECK <br />RETAINING WALL <br />EXISTING CONTOUR <br />PROPOSED CONTOUR <br />PROPOSED ELEVATION <br />WETLAND [DG[ <br />FWO-FULL WALKOUT <br />FBLO-FULL BASEMENT <br />FB-FULL OR SHALLOW BASEMENT <br />GRAPHIC SCALE <br />EA <br />' FEET` <br />`~~'== <br />------/8gO\------ <br />x 895.69 <br />TYPICAL HOUSE <br />WINDOW <br />BASEMENT ELEVATION <br />PAD (ASTERISK oomoT000Uzzooa -oaAomn LOT) <br />891.50 nomomp a�om���om 895.00 <br />��ou <br />895.00 <br />FINISHED GRADE ELEV. <br />GRADING NOTES AND SEQUENCING <br />888.00 <br />895.00 <br />BASEMENT OPENING <br />FINISHED GRADE ELEV <br />888.00 <br />Fits <br />895.00 <br />0 <br />� <br />= <br />moo <br />1� `� "` [-- <br />»a�!_-' <br />-- - -- <br />19 - <br />902.3 <br />21 <br />REAR OPENING <br />BASEMENT ELEVATION m \ <br />FINISHED GRADE ELEV <br />893.00 GARAGE ELEVATION <br />SILT FENCE 10 BE INSTALLED DOWNHILL FROM ANY THE GRADING ACTIVITY <br />SOME TREES AND DEAD FALL ARE TO BE CLEARED <br />BEGIN STIPPING TOPSOIL IN RIGHT OF WA <br />S[0|N[NT POND SHALL HAVE A SACRIFICIAL FOREBAY AT INLET TO CAPTURE SEDIMENT LOAD <br />SITEWORK SHALL BEGIN ONCE SILT FENCE IS INSTALLED <br />CONSTRUCT AND MAINTAIN ROCK CONSTRUCTION ENTRANCE OFF BIRCH STREET <br />SILT FENCE TO BE MAINTAINED DURING GRADING <br />STAKED BALE CHECKS SHALL INSTALLED PER THE PLAN <br />SEED AND MULCH DISTURBED AREAS WITHIN TWO WEEKS OF FINAL DISTURBANCE <br />SEED MIXTURE SHALL BE MNDOT SPEC. 3876. MIXTURE 7, AT A RATE OF 35 PLS Lbs/ACRE OR MNDOT SPEC. 500 <br />0A RATE OF 50 PLS Lbs/ACRE <br />MULCH RATE SHALL BE 2 TONS PER ACRE <br />ADHERE TO MINIMUM OPENING OR BASEMENT ELEVATION FOR EACH LOT <br />CONTRACTOR TO USE 15^ RCP (UNLESS OTHERWISE NOTED) STORM SEWER IN ROW AND IN GREEN SPACE <br />RIP-RAP SHALL BE CLASS U| <br />PONDS MAY BE LINED WITH NATIVE TOPSOIL OR HYDRIC SOILS FROM ANY SITE <br />POND BENCHES, INFILTRATION BASINS, AND SEDIMENT PONDS SHALL BE SEEDED WITH MNDOT MIX 25A <br />FILL MATERIAL FOR ROADS AND HOUSE PAD CAN BE OBTAINED FROM ANY WHERE WITHIN THE SITE <br />GRANULAR MATERIALS IF FOUND ON SITE CAN BE USED FOR ROAD BUILDING AND PAD FILL <br />GRANULAR MATERIALS FOUND AND USED ON SITE WILL REDUCE THE AMOUNT OF IMPORTED MATERIAL T0 THE 8T / <br />' <br />// <br />DEVELOPER SHALL USE TUFFTURF IF A HIGH VELOCITY BLANKET IS NEEDED <br />PARK <br />� <br />• <br />883.0. <br />� <br />' <br />/. <br />mm'� <br />IN HIGH EROSION CHANNELS <br />PAD SITES ARE ONLY PROPOSED, MIN. BSIAT ELEV. SHALL BE ADHERED TO <br />MIN. 0IAT ELEV. SHALL BE A MIN. OF 2' ABOVE 100 YEAR POND ELEVATIONS <br />DEVELOPER AND BUILDER HAS OPTION OF PLACING THE HOUSE <br />CONTACT WILLIAM MCCULLY AT GLENN REHBEIN COMPANIES AT (763) 784-0657 <br />SEE SHEE <br />2 <br />885.3 <br />1, <br />PLAN OR SPECIFICATION WAS <br />PREPARED BY LIE OR UNDER <br />MY DIRECT SUPERVISION AND <br />'THAT I AM A DULY REGISTERED <br />PROFESSIONAL ENGINEER <br />UNDER THE LAWS OF THE <br />STA 11.77,:r <br />DRAWN ` <br />wu <br />CHECKED <br />WAIN <br />amm <br />0/27/2001 <br />wRT1C.AL SCALE HOW. <br />308 NO. <br />00109 <br />8001( <br />PAGE <br />SHEET <br />OF 2 SHEETS,' <br />