Laserfiche WebLink
• <br />• <br />• <br />TOLTZ, KING, DUVALL, ANDERSON <br />2001 SURFACE WATER MANAGEMENT PROJECTS AND ASSOCIATES, INCORPORATED <br />CITY OF LINO LAKES, MINNESOTA ENGINEERS - ARCHITECTS - PLANNERS <br />COMMISSION NO. 12327 -01 <br />TABULATION OF BIDS <br />BIDS OPENED: 8/21/01 <br />*DENOTES ERROR IN BIDDER'S CALCULATION <br />ENGINEER'S ESTIMATE FOREST LAKE CONTRACTING <br />ITEM UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />$ 5,000.00 $ 5,000.00 <br />$ 24.00 $ 9,600.00 <br />$ 125.00 $ 250.00 <br />$ 4.00 $ 240.00 <br />0 <br />0 <br />0 <br />rn <br />0 <br />6' <br />EA <br />$ 4,200.00 $ 4,200.00 <br />$ 175.00 $ 525.00 <br />$ 60.00 $ 1,980.00 <br />$ 2,000.00 $ 2,000.00 <br />$ 900.00 $ 1,800.00 <br />$ 125.00 $ 750.00 <br />$ 4.00 $ 240.00 <br />$ 15,000.00 $ 750.00 <br />$ 12,245.00 <br />$ 5,500.00 $ 5,500.00 <br />$ 6.00 $ 1,242.00 <br />$ 300.00 $ 600.00 <br />$ 38.00 $ 7,866.00 <br />$ 1,000.00 $ 2,000.00 <br />$ 3,000.00 $ 6,000.00 <br />$ 125.00 $ 1,125.00 <br />$ 250.00 $ 500.00 <br />$ 4.00 $ 400.00 <br />$ 7,000.00 $ 1,050.00 <br />$ 26,283.00 <br />$ 1,000.00 $ 1,000.00 <br />$ 50.00 $ 20,000.00 <br />$ 120.00 $ 240.00 <br />$ 4.00 $ 240.00 <br />$ 21,480.00 <br />$ 500.00 $ 500.00 <br />$ 300.00 $ 900.00 <br />$ 32.00 $ 1,056.00 <br />$ 2,000.00 $ 2,000.00 <br />$ 800.00 $ 1,600.00 <br />$ 120.00 $ 720.00 <br />$ 4.00 $ 240.00 <br />$ 3,500.00 $ 175.00 <br />0 <br />0 <br />rn <br />r- <br />$ 1,000.00 $ 1,000.00 <br />$ 7.00 $ 1,449.00 <br />$ 200.00 $ 400.00 <br />$ 28.00 $ 5,796.00 <br />$ 750.00 $ 1,500.00 <br />$ 2,500.00 $ 5,000.00 <br />$ 120.00 $ 1,080.00 <br />$ 200.00 $ 400.00 <br />$ 4.00 $ 400.00 <br />$ 3,500.00 $ 525.00 <br />$ 17,550.00 <br />TWILIGHT ACRES 2ND ADD. <br />1 MOBILIZATION 1 LS <br />2 POND EXCAVATION (EV) 400 CY <br />3 RIP RAP, CL. III 2 CY <br />4 SILT FENCE 60 LF <br />SUBTOTAL <br />THOMAS STREET <br />1 MOBILIZATION 1 LS <br />2 CLEAR & GRUB TREE 3 EA <br />3 18" RCP, CL. 5 STORM SEWER PIPE 33 LF <br />4 CONST. STORM MANHOLE, TYPE 407 1 EA <br />5 18" RCP, FLARED END SECTION W/ TRASH GUARD 2 EA <br />6 RIP RAP, CL. III 6 CY <br />7 SILT FENCE 60 LF <br />8 SEEDING 0.05 AC <br />SUBTOTAL <br />MAR DON ACRES <br />1 MOBILIZATION 1 LS <br />2 REMOVE 12" CMP & APRONS 207 LF <br />3 REMOVE CATCH BASIN /MANHOLE 2 EA <br />4 15" RCP, CL. 5 STORM SEWER PIPE 207 LF <br />5 15" RCP, FLARED END SECTION W/TRASH GUARD 2 EA <br />6 CONST. CATCH BASIN /MANHOLE MNDOT PLATE 40 2 EA <br />7 RIP RAP, CL. III 9 CY <br />8 CONNECT TO EXISTING 12" RCP STORM SEWER PI 2 EA <br />9 SILT FENCE 100 LF <br />10 SEEDING 0.15 AC <br />SUBTOTAL <br />BID TABULATION <br />