Circle -Lex VFW
<br />page 10
<br />• This review is based on the following submittals, received December 18, 2003 unless
<br />otherwise noted:
<br />1. Site Plan, DSGW, received January 21, 2004
<br />2. Grading Plan, Metro Land Surveying & Engineering, received January 21, 2004
<br />3. Utility Plan, Metro Land Surveying & Engineering, received January 21, 2004
<br />4. Memo from Michael J. Thomas, DSGW, December 4, 2003, rec'd. January 21, 2004
<br />5. Letter from Brian Bourassa, Metro Land Surveying & Engineering, January 20, 2004,
<br />rec'd. January 21, 2004.
<br />6. Wall Section, December 18, 2003
<br />7. Floor Plan, DSGW, July 7, 2003
<br />8. Exterior Elevations, DSGW, July 7, 2003
<br />9. Landscape Plan, DSGW, December 18, 2003
<br />10. Landscape Details, DSGW, December 18, 2003
<br />11. Photometric Lighting Analysis, Engineering Design Initiative, December 18, 2003
<br />12. Boundary and Topographic Survey, E.G. Rud & Sons, Inc., 9/05/03, rec'd 10/10/03
<br />13. Code Data, DSGW, 10/9/03, rec'd 10/10/03
<br />14. Floor Plan, DSGW, 10/9/03, rec'd 10/10/03
<br />15. Exterior Elevation, DSGW, 10/9/03, rec'd 10/10/03
<br />16. Building Section, DSGW, 10/9/03, rec'd 10/10/03
<br />•
<br />•
<br />
|