|
18. This approval is based on the following plans and related correspondence:
<br />• Site Plan, DSGW, received January 21, 2004
<br />• Grading Plan, Metro Land Surveying & Engineering, received January 21, 2004
<br />• Utility Plan, Metro Land Surveying & Engineering, received January 21, 2004
<br />• Memo from Michael J. Thomas, DSGW, December 4, 2003, rec'd. January 21,
<br />2004
<br />• Letter from Brian Bourassa, Metro Land Surveying & Engineering, January 20,
<br />2004, rec'd. January 21, 2004.
<br />• Wall Section, December 18, 2003
<br />• Floor Plan, DSGW, July 7, 2003
<br />• Exterior Elevations, DSGW, July 7, 2003
<br />• Landscape Plan, DSGW, December 18, 2003
<br />• Landscape Details, DSGW, December 18, 2003
<br />• Photometric Lighting Analysis, Engineering Design Initiative, December 18,
<br />2003
<br />• Boundary and Topographic Survey, E.G. Rud & Sons, Inc., 9/05/03, rec'd
<br />10/10/03
<br />• Code Data, DSGW, 10/9/03, rec'd 10/10/03
<br />• Floor Plan, DSGW, 10/9/03, rec'd 10/10/03
<br />• Exterior Elevation, DSGW, 10/9/03, rec'd 10/10/03
<br />• Building Section, DSGW, 10/9/03, rec'd 10/10/03
<br />BE IT FURTHER RESOLVED that the Lino Lakes City Council hereby approves
<br />setback variances to allow the building to be 34 feet from the new Lake Drive right of
<br />way, and the parking drive to be 5 feet from the new Lake Drive right of way.
<br />Adopted by the Lino Lakes City Council this 9th day of February, 2004
<br />John J. Bergeson, Mayor
<br />ATTEST:
<br />Ann Blair, City Clerk
<br />Resolution 04 -18, page 3
<br />
|