My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/08/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
03/08/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 3:19:18 PM
Creation date
2/27/2014 11:14:34 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/08/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council <br />Legacy at Woods Edge <br />March 8, 2004 <br />3. Building Scale and Definition. These guidelines are intended to create buildings <br />with a human scale, making the development more pedestrian - friendly and a <br />pleasant place to walk. <br />Energy Conservation and Climatic Response. The effects of the Minnesota <br />climate can be mitigated through intelligent building design configuration and <br />landscape treatments. <br />The requirements contained within these categories will be incorporated into the <br />building design throughout the development. <br />Master Grading and Drainage and Erosion Control Plan <br />The City's engineering consultant SEH, Inc., has prepared a preliminary Grading, <br />Drainage and Erosion Control Plana Runoff from the site currently drains to the south <br />and east and ultimately discharges to Marshan Lake and George Watch Lake. <br />The development proposes to construct a drainage system within all the street <br />improvements and parking areas to convey runoff to proposed ponding areas and <br />infiltration cells (green space or underground storage chambers). Subsurface chamber <br />technology takes advantage of the soil's inherent filtration and renovation capabilities to <br />store and treat storm water runoff while providing the flexibility to plan for additional <br />buildings and green space. To maximize pollutant removal efficiencies, the water quality <br />control structures will be designed and constructed according to NURP, the City of Lino <br />Lakes, and Rice Creek Watershed District standards. <br />Storm water rate control and treatment will occur prior to any storm water being <br />discharged to receiving water bodies. Therefore, water quality in the receiving <br />waterbodies will not be adversely impacted. Treated storm water will either be naturally <br />infiltrated into the groundwater or will be discharged to existing wetland basins located <br />on and /or adjacent to the site. Water from these wetlands eventually will enter George <br />Watch Lake, Marshan Lake, and the ` remainder or the Rice Creek Chain of Lakes <br />system. <br />Master Utility Plan <br />The development is proposed to be serviced with public sanitary sewer and water <br />utilities. The sanitary sewer service will be provided by the existing trunk sanitary sewer <br />main that runs within both Town Center Parkway and Village Drive. The sanitary sewer <br />laterals will be extended through the site. <br />Water service will be provided by the existing trunk water main that runs within both <br />Town Center Parkway and Village Drive. The water laterals will be extended through <br />the site. A trunk line will be extended northerly across I -35W to provide a planned <br />improvement to the City's water system. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.