Eagle Brook Church
<br />page 16
<br />RECOMMENDATION
<br />Option 1
<br />This review is based on the following submittals:
<br />1. Eagle Brook Church Traffic Study, Supplemental Analysis, Draft Memorandum,
<br />Including Updates: February 2, February 23, March 5, March 15, 2004
<br />2. Preliminary Plat, 10/10/03, rec'd12 /18/03
<br />3. Certificate of Survey, SRF, 10/10/03
<br />4. Site Plan, BWBR and SRF, 12/18/03, received 12/18/03
<br />5. Grading Plan, BWBR and SRF, 12/18/03, received 12/18/03
<br />6. Utility Plan, BWBR and SRF, 12/18/03, received 12/18/03
<br />7. Construction Plan, SRF /18/03, received 12/18/03
<br />8. Landscaping Plan, BWBR, 12/18/03, received 12/18/03
<br />9. Tree Preservation Plan, BWBR, 12/18/03, received 12/18/03
<br />10. Signage and Building Cross Details, 12/17/03, received 12/18/03
<br />11. First and Second Floor Plans, BWBR, 10/13/03, corrected square footages e -mail
<br />from Ron Laughlin, BWBR
<br />12. Building Elevations, BWBR, 10/13/03
<br />13. Photometric Plan, BWBR and Ericksen Ellison and Assoc., 10/14/03, received
<br />10/15/03
<br />14. Lighting Fixture cutsheets, Lithonia Lighting
<br />15. Onsite Wastewater Treatment System Final Design Report and Specifications,
<br />Eco Systems Engineering, Oct. 8, 2003
<br />16. Narrative, SRF
<br />17. Description of Fire Protection System and Electrical Generator System,
<br />Memorandum, Ericksen Ellison and Assoc., 10/13/03
<br />Resolution 04 -17, page 16