My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/07/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
04/07/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2014 3:39:40 PM
Creation date
2/28/2014 8:32:34 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/07/2004
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />MEMORANDUM <br />DATE: April 5, 2004 <br />TO: City Council <br />FROM: Michael Grochala <br />RE: Lake Drive /I -35W Interchange Study <br />April 7, 2004 City Council Work Session <br />As part of the Legacy at Woods Edge development review process, a traffic study <br />prepared by Short, Elliott, Hendrickson, Inc., identified the necessary improvements to <br />Lake Drive that would be required to facilitate development. These improvements <br />included the following: <br />1. Signalization of Town Center Parkway/Lake Drive intersection and both ramps to <br />I -35W. <br />2. Realignment of the northbound I -35W ramp. <br />3. Construction of two southbound left turn lanes between the I -35W bridge and <br />Town Center Parkway. <br />4. Construction of a southbound left turn lane at the northbound I -35W ramp. <br />5. Construction of northbound right and left turn lanes at the Town Center <br />Parkway/Lake Drive intersection. <br />While the feasibility study for the proposed improvements, both internal and external to <br />the Legacy site, is just commencing, the very preliminary cost estimate for the Lake <br />Drive improvements is approximately $2.4 million. It is anticipated that these <br />improvements would be, for the most part temporary, until the reconstruction of the I- <br />35W interchange. <br />Because of the estimated cost of the Lake Drive improvements and the recognized need <br />for improving the I -35W interchange, staff is evaluating options to: 1) facilitate <br />improvement of the interchange in conjunction with the Legacy project; 2) minimize the <br />extent of reconstruction if the interchange is constructed at a later date; and 3) provide a <br />planning base to pursue county, state and/or federal funding for interchange <br />improvements. <br />J:\mgrochala\Projects\ Village \Correspondence \4 -07 -04 Interchange Study Council Memo.dot <br />
The URL can be used to link to this page
Your browser does not support the video tag.