My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/24/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
05/24/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 10:28:02 AM
Creation date
3/3/2014 8:40:52 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/24/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Contract <br />Hailey Manor 5 -24 -2004 <br />VI. BUILDING PERMITS <br />A. The Developer agrees that building permits may be issued upon approval of the <br />Final Plat by the City Council at which time all required Financial Security shall be <br />in place with the City. The Developer further agrees that City Sewer, Water, Storm <br />Sewer, and Bituminous Base Construction of the Streets, temporary street signs, gas, <br />electric, and telephone will be completed prior to the issuance of building permits <br />except for as provided in VI. C. <br />B. The Developer further agrees that an as -built survey certifying that all the grading <br />complies with the grading plan prior to issuance of building permits. <br />C. Arlo Lane Homes <br />The City agrees that three homes can be installed on Arlo Lane upon approval of <br />final plat. The right to obtain such building permits shall be contingent upon the <br />following: <br />1. Execution of this development contract, providing a Letter of Credit in the <br />amount of $100,000.00 and an escrow amount of $10,000.00. <br />2. Construction shall be limited to maintain a minimum distance of 150' from <br />the furthest exterior wall to an improved gravel street as per the State Fire <br />Code. The Developer may construct and maintain such access in order to <br />meet said requirements. <br />3. Prior to release of the building permits, the builder shall enter into a separate <br />agreement with the City which would not allow the building to be occupied <br />after issuance of certificate of occupancy by anyone other than the builder <br />for exhibiting the home for model purposes nor would they convey the <br />property to any other third parties by any means until all of the public and <br />private utilities have been installed to serve the building and accepted by the <br />City. This includes all other requirements provided in this agreement <br />D. Each lot must comply with erosion control measures to prevent any material from <br />leaving the lot. The City of Lino Lakes will not perform any requested inspections on <br />the lot until it complies to the erosion control requirements. <br />E. Each lot must have a City approved Certificate of Grading showing the as- built <br />survey prior to an issuance of a Certificate of Occupancy. It shall be the responsibility <br />of the Developer, its purchasers, builders or contractors to ensure compliance with the <br />grading plan. <br />page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.