My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/14/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
06/14/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 10:53:01 AM
Creation date
3/3/2014 9:59:24 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/14/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Lino Lakes, Minnesota <br />Legacy At Woods Edge <br />A -LI NOL0305.02 <br />PRELIMINARY ESTIMATE <br />109 Ornamental Tree <br />110 Potting Soil for Planter <br />111 Topsoil Borrow <br />Subtotal Construction Cost <br />+ 10 % Construction Contingency <br />Estimated Construction Cost <br />+ 30% Eng., Legal, Admin. <br />TOTAL STREETSCAPE IMPROVEMENT COST <br />EA <br />CY <br />CY <br />5 $250.00 $1,250.00 <br />650 $12.00 $7,800.00 <br />880 $12.00 $10,560.00 <br />$871,830.00 <br />$87,183.00 <br />$959,013.00 <br />$287,703.90 <br />$1,246,716.90 <br />6/10/04 <br />Construction Cost Summary (rev 6 -1 -04) Page 4 of 7 <br />Total <br />Item <br />No. Description <br />Estimated <br />Unit <br />Unit <br />Quantity <br />Price <br />Total <br />109 Ornamental Tree <br />110 Potting Soil for Planter <br />111 Topsoil Borrow <br />Subtotal Construction Cost <br />+ 10 % Construction Contingency <br />Estimated Construction Cost <br />+ 30% Eng., Legal, Admin. <br />TOTAL STREETSCAPE IMPROVEMENT COST <br />EA <br />CY <br />CY <br />5 $250.00 $1,250.00 <br />650 $12.00 $7,800.00 <br />880 $12.00 $10,560.00 <br />$871,830.00 <br />$87,183.00 <br />$959,013.00 <br />$287,703.90 <br />$1,246,716.90 <br />6/10/04 <br />Construction Cost Summary (rev 6 -1 -04) Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.