Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Lino Lakes, Minnesota <br />Legacy at Woods Edge <br />A -LI NOL0305.02 <br />PHELIMINAHY ES1IMA1t <br />Total <br />Item <br />No. Description <br />Estimated <br />Unit <br />Unit <br />Quantity <br />Price <br />Total <br />LAKE DRIVE IMPROVEMENTS <br />1 Mobilization <br />2 Traffic Control <br />3 Common Excavation <br />4 Concrete Removal <br />5 Select Granular Borrow (CV) <br />6 Aggregate Base, Class 5 <br />7 Type LV Non - wearing Course Mixture <br />8 Type LV Wearing Course Mixture <br />9 Bituminous Material for Tack Coat <br />10 B618 Concrete Curb and Gutter <br />11 D424 Concrete Curb and Gutter <br />12 5" Concrete Sidewalk <br />13 Storm Sewer <br />14 Full- Actuated Traffic Signal (Permanent) <br />15 Full- Actuated Traffic Signal (Temporary) <br />16 Traffic Signal Interconnection <br />17 F &I Sign Panels, Type C <br />18 4" Solid White or Yellow Pavement Marking - Epoxy <br />19 Pavement Message - Left Arrow - Epoxy <br />20 Pavement Message - Right Arrow - Epoxy <br />21 Street Sweeper with Pick -up Broom with Operator <br />22 Skidsteer (bobcat) with Operator <br />23 Silt Fence <br />24 Sodding, Incl. 4" Topsoil <br />25 Seeding, incl. Seed, Mulch and Disk Anchor <br />Subtotal Construction Cost <br />+ 10 % Construction Contingency <br />Estimated Construction Cost <br />+ 30% Eng., Legal, Admin. <br />TOTAL LAKE DRIVE IMPROVEMENT COST <br />LS <br />LS <br />CY <br />CY <br />CY <br />T <br />T <br />T <br />GAL <br />LF <br />LF <br />SF <br />LS <br />LS <br />LS <br />LS <br />SF <br />LF <br />EA <br />EA <br />HR <br />HR <br />LF <br />SY <br />AC <br />1 $71,900.00 $71,900.00 <br />1 $25,000.00 $25,000.00 <br />15,000 $6.50 $97,500.00 <br />800 $25.00 $20,000.00 <br />3,670 $13.00 $47,710.00 <br />5,850 $9.50 $55,575.00 <br />2,550 $32.00 $81,600.00 <br />1,275 $35.00 $44,625.00 <br />1,200 $1.50 $1,800.00 <br />4,500 $8.00 $36,000.00 <br />500 $8.50 $4,250.00 <br />13,500 $3.00 $40,500.00 <br />1 $60,000.00 $60,000.00 <br />1 $300,000.00 $300,000.00 <br />2 $250,000.00 $500,000.00 <br />1 $50,000.00 $50,000.00 <br />1,200 $28.50 $34,200.00 <br />3,200 $1.50 $4,800.00 <br />5 $120.00 $600.00 <br />6 $120.00 $720.00 <br />20 $110.00 $2,200.00 <br />20 $75.00 $1,500.00 <br />2,600 $3.00 $7,800.00 <br />6,700 $3.00 $20,100.00 <br />2.00 $1,500.00 $3,000.00 <br />$1,511,380.00 <br />$151,138.00 <br />$1,662,518.00 <br />$498,755.40 <br />$2,161,273.40 <br />FREEWAY RAMP IMPROVEMENTS <br />1 Mobilization LS 1 $8,000.00 $8,000.00 <br />2 Traffic Control LS 1 $15,000.00 $15,000.00 <br />3 Common Excavation CY 2,500 $6.50 $16,250.00 <br />4 Concrete Removal CY 600 $25.00 $15,000.00 <br />5 Select Granular Borrow (CV) CY 1,155 $13.00 $15,015.00 <br />6 Aggregate Base, Class 5 T 1,600 $9.50 $15,200.00 <br />7 Type LV Non - wearing Course Mixture T 800 $32.00 $25,600.00 <br />8 Type LV Wearing Course Mixture T 400 $35.00 $14,000.00 <br />9 Bituminous Material for Tack Coat GAL 360 $1.50 $540.00 <br />10 D424 Concrete Curb and Gutter LF 2,000 $8.50 $17,000.00 <br />11 F &I Sign Panels, Type C SF 500 $28.50 $14,250.00 <br />12 Silt Fence LF 2,000 $3.00 $6,000.00 <br />13 Sodding, Incl. 4" Topsoil SY 1,300 $3.00 $3,900.00 <br />14 Seeding, incl. Seed, Mulch and Disk Anchor AC 1.50 $1,500.00 $2,250.00 <br />Subtotal Construction Cost <br />+ 10 % Construction Contingency <br />Estimated Construction Cost <br />+ 30% Eng., Legal, Admin. <br />TOTAL FREEWAY RAMP IMPROVEMENTS COST <br />PROJECT COST SUMMARY <br />ESTIMATED PROJECT COST (LAKE DRIVE) <br />ESTIMATED PROJECT COST (FREEWAY RAMPS) <br />$168,005.00 <br />$16,800.50 <br />$184,805.50 <br />$55,441.65 <br />$240,247.15 <br />$2,161,273.40 <br />$240,247.15 <br />TOTAL ESTIMATED PROJECT COST $2,401,520.55 <br />6/10/04 <br />Construction Cost Summary (rev 6 -1 -04) Page 1 of 1 <br />