My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/12/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
10/12/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2014 10:25:34 AM
Creation date
3/5/2014 8:54:08 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/12/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Development Contract — Site Grading and Bridge Only <br />Pheasant Hills Preserve 12th <br />3. Tree Preservation Plan <br />a) The Developer shall provide a tree preservation plan prior to any site <br />grading and include a delineated preservation area, subject to the <br />approval of the City prior to any work activity on the site. The tree <br />preservation plan shall also be completed in accordance with the <br />City Tree Preservation Policy, and shall be covered within a legal <br />covenant for each property. The Developer shall provide a cash <br />escrow as security, in the amount specified in Attachment B, to <br />insure implementation of the Tree Preservation Plan. Site activities <br />shall not commence until review of the plan and site has been <br />completed and approved by the City Engineer, City Forester, and any <br />other governing agency with jurisdiction as required. <br />b) The Developer shall remove, dispose of, or treat all dead and <br />diseased trees in accordance with the City Forester's <br />recommendation before building permits will be issued. <br />4. Grading and Erosion Control Construction & Maintenance <br />a) Prior to the commencement of site grading and erosion control, the <br />Developer shall complete items II.A.1, II.A.2, and II.A.3 as listed <br />above. <br />b) The Developer shall grade the site to within 0.2 foot of the grades <br />shown on the approved Grading plan. No deviations will be allowed <br />unless a revised plan is submitted and approved by the City and all <br />other regulatory agencies. <br />c) All development shall conform to the natural limitations presented <br />by the topography and soil of the subdivision in order to create the <br />best potential for preventing soil erosion. <br />d) Erosion and siltation control measures shall be coordinated with the <br />different stages of development. Appropriate control measures as <br />required by the City shall be installed prior to development when <br />necessary to control erosion. <br />e) Land shall be developed in increments of workable size such that <br />adequate erosion and siltation controls can be provided as <br />construction progresses. The smallest practical area of land shall be <br />exposed at any one period of time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.