Laserfiche WebLink
• <br />Anoka County Multi- Jurisdictional <br />All Hazards Mitigation Plan <br />Action <br />Action /Project Description <br />Jurisdiction <br />Responsibility <br />Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br />2.1.1 <br />Establish fire lockbox <br />Guidelines. <br />Linwood <br />Fire Dept. <br />1000 <br />10000Township <br />2.1.2Obtain lockbox Equipment. <br />Linwood <br />Fire Dept. <br />2000 <br />1000000Grants <br />Implement lockbox <br />2.1.3Program. <br />Linwood <br />Fire Dept. <br />1000 <br />10000Township <br />2.1.4Maintain lockbox Records. <br />Linwood <br />Fire Dept. <br />1000 <br />10000Township <br />Goal 3: Improve the townships warning and notification. <br />Objective 3.1: Purchase outdoor warning sirens. <br />Action <br />Action /Project Description <br />Jurisdiction <br />Responsibility <br />Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br />3.1.1 <br />Purchase and Install six <br />strategically placed <br />warning sirens. <br />Linwood <br />Township <br />108000 <br />1000000Grants, <br />Local, <br />HSEM <br />3.1.2sounding. <br />Educate residents on the <br />protocol of the sirens <br />Linwood <br />Township <br />1000 <br />10000 <br />Local <br />OAK GROVE MITIGATION GOALS /OBJECTIVES /ACTIONS /STRATEGY <br />Goal 1: Multiple access routes in single access developments. <br />Objective 1.1: Establish multiple access routes for emergency response in single access <br />developments. <br />Action <br />If <br />Action /Project Description <br />Jurisdiction <br />Responsibility <br />Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br />1.1.1 <br />Establish and prioritize <br />criteria for feasible access <br />routes. <br />Oak Grove <br />Planning and <br />Consulting <br />Engineer <br />20000 <br />80000City <br />Budget <br />1.1.2easements. <br />Acquire access route <br />Oak Grove <br />City <br />500000 <br />2000000City Budget <br />1.1.3roads. <br />Construction of access <br />Oak Grove <br />Consulting <br />Engineer <br />1000000 <br />2000000City Budget <br />1.1.4access <br />Ongoing maintenance of <br />routes. <br />Oak Grove <br />Public Works <br />500000 <br />200000City Budget <br />Goal 2: Improve the City of Oak Grove's outdoor warning and notification. <br />Objective 2.1: Maintenance and replacement of outdoor warning siren system for emergency <br />notifications <br />Action <br />Action /Project Description <br />Jurisdiction <br />Responsibility <br />Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br />2.1.1 <br />Evaluate current warning <br />system, determine level of <br />operability and establish <br />replacement schedule. <br />Oak Grove <br />Public Works <br />4000 <br />4000City <br />Budget <br />2.1.2outdoor <br />Purchase four more <br />warning sirens. <br />Oak Grove <br />City <br />72000 <br />2000000Grant <br />City, HSEM <br />2.1.3units, <br />Maintenance of warning <br />periodic testing. <br />Oak Grove <br />Emergency <br />Management <br />10000 <br />City/ <br />10000County <br />Goal 3: To keep residents and visitors safe while in the city parks. <br />Objective 3.1: To provide severe weather shelter space at all city park facilities. <br />Actio <br />n <br />Action /Project Description <br />Jurisdictio <br />n <br />Responsibility <br />Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br />