Laserfiche WebLink
• <br />• <br />• <br />Anoka County Multi Jurisdictional <br />All Hazards Mitigation Plan <br />1.1.3 <br />60 <br />Conduct Firewise clean up <br />efforts. <br />Lino Lakes <br />1 -1 -08 <br />Ongoing replacement of warning <br />2.1.2 <br />60 <br />units. <br />Lino Lakes <br />Ongoing <br />Update existing development <br />1.1.1 <br />60 <br />plan (CI P). <br />Ramsey <br />6 -1 -07 <br />Ongoing replacement of warning <br />6.1.3 <br />60 <br />units. <br />Ramsey <br />Ongoing <br />Provide funds for hazardous <br />materials awareness training for <br />all fire, EMS, rescue, and law <br />enforcement emergency <br />2.1.1 <br />60 <br />responders. <br />St. Francis <br />6 -1 -07 <br />Install generators in critical <br />government facilities and fuel <br />1.3.2 <br />59 <br />depots. <br />All <br />6 -1 -07 <br />Identify repetitive loss areas and <br />3.1.3 <br />59 <br />structures. <br />All <br />1 -1 -07 <br />Use mapping database to restrict <br />development in defined flood <br />3.1.5 <br />59 <br />hazard areas. <br />All <br />6 -1 -07 <br />Provide equipment to allow <br />responders safe entry at Meth <br />6.2.2 <br />59 <br />labs. <br />All <br />6 -1 -07 <br />Fund training for all firefighters in <br />8.2.1 <br />59 <br />containing hazardous spills. <br />All <br />6 -1 -07 <br />Direct flow of traffic and support <br />security during mass dispensing <br />10.2.1 <br />59 <br />or during a compromised event. <br />All <br />Ongoing <br />Purchase and install new city hall <br />2.1.359 <br />generator. <br />Andover <br />6 -1 -07 <br />Clean debris from city owned <br />culverts and catch basins <br />2.1.3 <br />59 <br />annually. <br />Anoka <br />Ongoing <br />Create a safe room "Matching <br />Grant" incentive to defray costs to <br />1.1.3 <br />59 <br />homeowner. <br />Blaine <br />6 -1 -07 <br />Create a fire sprinkler "Matching <br />Grant" incentive to defray costs to <br />2.1.3 <br />59 <br />homeowner. <br />Blaine <br />6 -1 -07 <br />Install siren Battery Backup <br />3.1.4 <br />59 <br />Systems. <br />Blaine <br />6 -1 -07 <br />Make storm water upgrades as <br />7.2.259planned. <br />Columbia Heights <br />6 -1 -07 <br />2.1.2 <br />59 <br />Complete storm water utility plan. <br />Coon Rapids <br />6 -1 -07 <br />MNDOT Hwy 10 corridor plan for <br />3.1.6592030 <br />Vision project. <br />Coon Rapids <br />1 -1 -08 <br />