Laserfiche WebLink
• <br />• <br />• <br />Anoka County Multi - Jurisdictional <br />All Hazards Mitigation Plan <br />4.1.4 <br />57 <br />Ongoing access route <br />maintenance. <br />Ramsey <br />Ongoing <br />1.1.2 <br />56 <br />Complete safety upgrades for <br />pilot RR grade crossings and <br />implement whistle -free zones. <br />Coon Rapids <br />1 -1 -08 <br />2.1.3 <br />56 <br />Complete storm water <br />management plan. <br />Coon Rapids <br />1 -1 -08 <br />1.1.5 <br />56 <br />Review bids and hire contractor <br />for fuel tank clean up. <br />East Bethel <br />6 -1 -07 <br />3.1.5 <br />56 <br />Contractor builds shelters. <br />East Bethel <br />1 -1 -08 <br />1.1.4 <br />56 <br />Ongoing maintenance of access <br />routes. <br />Oak Grove <br />Ongoing <br />1.1.4 <br />55 <br />Purchase /install an automated <br />wide area notification system. <br />Anoka County <br />1 -1 -08 <br />3.1 1 <br />55of <br />Develop plans to recruit, train, <br />and implement a community wide <br />ERT to be activated during times <br />disaster. <br />Circle Pines <br />6 -1 -07 <br />2.1.5 <br />55 <br />Enlarging culverts pipes. <br />Coon Rapids <br />1 -1 -08 <br />3.1.1 <br />55design <br />Complete traffic engineering and <br />work. <br />Coon Rapids <br />6 -1 -07 <br />3.1.355 <br />Traffic flow Cooperative <br />construction agreements. <br />Coon Rapids <br />6 -1 -07 <br />1.1.6 <br />55 <br />Contractor removes fuel tanks. <br />East Bethel <br />1 -1 -08 <br />1.1.2 <br />55 <br />Acquire access route easements. <br />Oak Grove <br />1 -1 -08 <br />3.2.3541mprove <br />access to main highway. <br />Columbus <br />1 -1 -08 <br />1.1.3 <br />54 <br />Develop a plan to keep the <br />current and future sewer mains <br />clear of debris to avoid flooding, <br />by routing cleaning /maintenance. <br />St. Francis <br />1 -1 -07 <br />1.1.3 <br />53 <br />Construction of access roads. <br />Oak Grove <br />1 -1 -08 <br />1.1.4 <br />53 <br />On -going access corridor <br />maintenance. <br />Ramsey <br />Ongoing <br />1.1.2 <br />53 <br />Enhance the current water <br />treatment system allowing for <br />better emergency / regulatory <br />water flow. <br />St. Francis <br />1 -1 -08 <br />3.2.2 <br />52 <br />Raise grade level of identified <br />roadways. <br />All <br />1 -1 -08 <br />3.1.8 <br />52 <br />Complete Coon Rapids portion of <br />MNDOT's TH 10 widening. <br />Coon Rapids <br />1 -1 -09 <br />4.1.2 <br />52 <br />Acquire access routes <br />easements. <br />Ramsey <br />1 -1 -08 <br />2.1.1 <br />51 <br />New storm sewer installation <br />during Anoka's annual street <br />renewal project. To prevent on <br />street localized flooding. <br />Anoka <br />1 -1 -08 <br />