My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/12/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
03/12/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2014 11:10:40 AM
Creation date
3/10/2014 11:32:46 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/12/2007
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />SITE DESIGN FOR THE NEW FACILITY <br />Setback Requirements <br />The proposed building meets or exceeds all of the setback requirements for the GB (General <br />Business) zoning district. <br />Building Elevations <br />The building materials used for the proposed structures include a base of rock faced CMU, brick <br />covering of the canopy supports and building face, and EIFS finish for the canopy facade /top and <br />building accents. All of these materials conform to the requirements of the zoning ordinance. <br />Building Height <br />According to the Zoning Ordinance, no building within the GB (General Business) zoning <br />district may exceed 45 feet in height. At a maximum height of approximately 20 feet, 10 inches <br />in height, the proposed motor fuel station and car wash complies with the ordinance. <br />Landscaping <br />The landscaping plan is conforming to the minimum requirements of the Zoning Ordinance, and <br />the applicant has added a hedge row along the south end of the southern parking area to limit the <br />overflow of vehicle headlights onto Town Center Parkway and to improve the livability of the <br />existing residential property on the south side of Town Center Parkway. <br />Green Area <br />The GB (General Business) zoning district requires that impervious surface coverage not exceed <br />75 %. Plans currently show the Holiday Store with an impervious surface coverage of 56% and <br />Lot 2 with an impervious surface coverage of 49 %, both within the limitations of the district. <br />Access /Circulation <br />Access to the site is currently provided via two exit/entry drives directly from Lake Drive on the <br />east side of the site. The Lake Drive and Town Center Parkway improvement project will create <br />two exit /entry drives on the south side of the site via Town Center Parkway and will immediately <br />close the southern drive on Lake Drive. The northern exit/entry drive from Lake Drive will <br />remain for two years from the completion of the Town Center Parkway improvements. It will <br />function as a right -in only to limit traffic conflict points. This access is for the existing facility <br />and will cease upon the end of the two year time limit or the construction of a new facility, <br />whichever occurs first. This access plan will provide the safest access to and from the site and <br />the internal circulation will work well with the proposed layout. <br />Principal <br />Required <br />30 feet <br />Building <br />Proposed <br />165 feet <br />Parking <br />Required <br />15 feet <br />Lot <br />Proposed <br />20 feet <br />Town Center Parkway <br />Lake Drive <br />40 feet <br />75 feet <br />15 feet <br />15 feet <br />Interstate 35W <br />40 feet <br />62 feet <br />15 feet <br />25 feet <br />Side Yard <br />10 feet <br />87 feet <br />10 feet <br />30 feet <br />The proposed building meets or exceeds all of the setback requirements for the GB (General <br />Business) zoning district. <br />Building Elevations <br />The building materials used for the proposed structures include a base of rock faced CMU, brick <br />covering of the canopy supports and building face, and EIFS finish for the canopy facade /top and <br />building accents. All of these materials conform to the requirements of the zoning ordinance. <br />Building Height <br />According to the Zoning Ordinance, no building within the GB (General Business) zoning <br />district may exceed 45 feet in height. At a maximum height of approximately 20 feet, 10 inches <br />in height, the proposed motor fuel station and car wash complies with the ordinance. <br />Landscaping <br />The landscaping plan is conforming to the minimum requirements of the Zoning Ordinance, and <br />the applicant has added a hedge row along the south end of the southern parking area to limit the <br />overflow of vehicle headlights onto Town Center Parkway and to improve the livability of the <br />existing residential property on the south side of Town Center Parkway. <br />Green Area <br />The GB (General Business) zoning district requires that impervious surface coverage not exceed <br />75 %. Plans currently show the Holiday Store with an impervious surface coverage of 56% and <br />Lot 2 with an impervious surface coverage of 49 %, both within the limitations of the district. <br />Access /Circulation <br />Access to the site is currently provided via two exit/entry drives directly from Lake Drive on the <br />east side of the site. The Lake Drive and Town Center Parkway improvement project will create <br />two exit /entry drives on the south side of the site via Town Center Parkway and will immediately <br />close the southern drive on Lake Drive. The northern exit/entry drive from Lake Drive will <br />remain for two years from the completion of the Town Center Parkway improvements. It will <br />function as a right -in only to limit traffic conflict points. This access is for the existing facility <br />and will cease upon the end of the two year time limit or the construction of a new facility, <br />whichever occurs first. This access plan will provide the safest access to and from the site and <br />the internal circulation will work well with the proposed layout. <br />
The URL can be used to link to this page
Your browser does not support the video tag.